Roll No. HEEEEEEEEEE Total No. of Pages : 01
Total No. of Questions : 05
--- Content provided by FirstRanker.com ---
B. Arch. (Sem.-10)
CONSTRUCTION MANAGEMENT-I
Subject Code : AR-526
M.Code : 45077
Time : 3 Hrs. Max. Marks : 50
--- Content provided by FirstRanker.com ---
INSTRUCTION TO CANDIDATES :
- Attempt any THREE questions.
- Explain the role of Project Management in Architecture and Construction Industry.
- What are the various stages of construction and teams involved for a group housing project?
- Explain in detail with illustrations :
- C.P.M analysis
- Cost time Analysis.
--- Content provided by FirstRanker.com ---
- Explain the safety and security precautions and measures to be observed at a construction site
- Explain
- Temporary services at construction site.
- Inspection and quality control.
--- Content provided by FirstRanker.com ---
NOTE : Disclosure of identity by writing mobile number or making passing request on any page of Answer sheet will lead to UMC case against the Student.
1|M-45077 (S17)-2641
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B-Arch 2019 May Previous Question Papers