FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU B.Tech 2020 Winter 6th Sem 2162505 Estimating And Costing Question Paper

Download GTU (Gujarat Technological University Ahmedabad) B.Tech/BE (Bachelor of Technology/ Bachelor of Engineering) 2020 Winter 6th Sem 2162505 Estimating And Costing Previous Question Paper

This post was last modified on 04 March 2021

GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE- SEMESTER-VI (NEW) EXAMINATION - WINTER 2020

--- Content provided by‌ FirstRanker.com ---

Subject Code:2162505 Date:27/01/2021
Subject Name:Estimating and Costing
Time:02:00 PM TO 04:00 PM Total Marks: 56

Instructions:
1. Attempt any FOUR questions out of EIGHT questions.

--- Content provided by‍ FirstRanker.com ---

2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

MARKS

Q.1 (a) Define terms: (i) Fixed costs (ii) Variable costs (iii) Marginal costs 03
(b) Enlist the main tools and techniques of cost reduction. 04

--- Content provided by‌ FirstRanker.com ---

(c) Discuss different techniques used for cost control. 07

Q.2 (a) Define costing. Give the difference between estimating & costing. 03
(b) Discuss advantages of efficient costing. 04
(c) Enlist and explain different methods of costing. 07

Q.3 (a) Give the main functions of an estimator. 03

--- Content provided by FirstRanker.com ---

(b) Explain importance of estimating with example. 04
(c) Discuss constituents of estimation. 07

Q.4 (a) Explain procedure used for calculate the material cost. 03
(b) Discuss fixed overheads and variable overheads. 04
(c) Enlist methods of on-cost allocation. Explain any two of them. 07

--- Content provided by​ FirstRanker.com ---

Q.5 (a) Give the objective of labour costing. 03
(b) Define wages. Explain nominal wages and real wages. 04
(c) Discuss ways to control over material cost. 07

Q.6 (a) Give advantages of incentive system. 03
(b) Discuss characteristics of a good incentive system. 04

--- Content provided by‌ FirstRanker.com ---

(c) Enlist and explain, ‘methods commonly used for valuation of 07
materials issued from stores.

Q.7 (a) Define mensuration. Explain its importance in engineering. 03
(b) Estimate the total time taken to turn a 100 mm long and 25 mm 04
diameter M. S. rod to a diameter of 23 mm in a single cut. Assume

--- Content provided by⁠ FirstRanker.com ---

cutting speed to be 25 m/min, feed to be 0.1 mm/rev and the
mounting time in self-centering 3-jaw chuck to be 40 sec. neglect
the time taken to for setting up tool etc.
(c) Explain methods used to measure areas of irregular figures. 07

Q.8 (a) Explain different forging operations. 03

--- Content provided by‌ FirstRanker.com ---

(b) Explain types of sheet metal joints. 04
(c) Discuss: (i) Estimation of pattern cost and (ii) Estimation in foundry 07
shop

FirstRanker.com


--- Content provided by FirstRanker.com ---


This download link is referred from the post: GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University