FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU B.Tech 2020 Winter 7th Sem 2172502 Productivity Improvement Methods Question Paper

Download GTU (Gujarat Technological University Ahmedabad) B.Tech/BE (Bachelor of Technology/ Bachelor of Engineering) 2020 Winter 7th Sem 2172502 Productivity Improvement Methods Previous Question Paper

This post was last modified on 04 March 2021

GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University


Enrolment No.

BE- SEMESTER-VII (NEW) EXAMINATION - WINTER 2020

Subject Code:2172502 Date:19/01/2021

--- Content provided by‌ FirstRanker.com ---

Subject Name:Productivity Improvement Methods

Time:10:30 AM TO 12:30 PM Total Marks: 56

Instructions:

  1. Attempt any FOUR questions out of EIGHT questions.
  2. Make suitable assumptions wherever necessary.
  3. --- Content provided by⁠ FirstRanker.com ---

  4. Figures to the right indicate full marks.

MARKS

Q.1 (a) Define the following. 03

  1. Productivity,
  2. Productivity improvement techniques and
  3. --- Content provided by⁠ FirstRanker.com ---

  4. Production.

(b) Enlist the technical methods to improve productivity. 04

(c) Explain importance of productivity and Explain various factors affecting productivity. 07

Q.2 (a) Brief explain the Flow process chart with neat sketch. 03

(b) Explain the string diagram with neat sketch. 04

--- Content provided by FirstRanker.com ---

(c) Explain the procedure for method study. 07

Q.3 (a) Enlist work measurement tools. 03

(b) What are the objectives of work measurement? 04

(c) Define productivity index. Explain different types of productivity measurement. 07

Q.4 (a) Write full form of: (i) SIMO (ii) PMTS (iii) NPC 03

--- Content provided by‌ FirstRanker.com ---

(b) Enlist the ergonomics principles. 04

(c) Enlist various incentive schemes. Explain how incentive scheme play a vital role to improve the workers efficiency. 07

Q.5 (a) Write a difference between two handed process chart and flow process chart in terms of symbols and construction. 03

(b) Briefly explain “SIMO”. 04

(c) Write a short note on Business Process Reengineering. 07

--- Content provided by‌ FirstRanker.com ---

Q.6 (a) Explain the working of National Productivity Councils. 03

(b) Briefly explain “MTM”. 04

(c) Explain the role of environment factor to effect worker performance. 07

Q.7 (a) Define Therblings. 03

(b) What are the objectives and application of BPR? 04

--- Content provided by‍ FirstRanker.com ---

(c) Explain the importance of BPR with suitable example. 07

Q.8 (a) Explain the role of Stop watch in Productivity improvement technique. 03

(b) Briefly explain the word “PMTS”. 04

(c) Enlist any seven types of Therblings with neat symbol. 07

FirstRanker.com

--- Content provided by‍ FirstRanker.com ---



This download link is referred from the post: GTU B.Tech 2020 Winter Question Papers || Gujarat Technological University

--- Content provided by‍ FirstRanker.com ---