Download GTU (Gujarat Technological University Ahmedabad) B.Tech/BE (Bachelor of Technology/ Bachelor of Engineering) 2020 Winter 8th Sem 2180611 Construction Management Previous Question Paper
Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE- SEMESTER?VIII (NEW) EXAMINATION ? WINTER 2020
Subject Code:2180611 Date:19/01/2021
Subject Name:Construction Management
Time:02:00 PM TO 04:00 PM Total Marks: 56
Instructions:
1. Attempt any FOUR questions out of EIGHT questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
MARKS
Q.1 (a) Explain tendering stage of project .
03
(b) Explain (i) Total float (ii) Dummy activity
04
(c) Calculate Earliest start time ,Latest start time , Earliest Finish Time and Latest
07
Finish time and critical path for the following project
Activity
Predecessor
Duration
in
Activity
weeks
A
-
3
B
A
4
C
A
2
D
B
5
E
C
1
F
C
2
G
D,E
4
H
F,G
3
Q.2 (a) Describe limitations of Bar chart .
03
(b) For different activities of certain project to,tm and tp in days are given below
04
calculate expected duration , Variance and standard deviation for each activity
Activity
to
tm
tp
A
3
7
15
B
2
8
12
C
1
3
7
D
6
18
26
(c) What are the functions of organizations? Describe Line or military
07
organization
Q.3 (a) Why PERT is considered better than CPM , for research and complicated
03
projects ?
(b) Describe advantages of Project scheduling
04
(c) Describe resources smoothing .
07
Q.4 (a) Explain (i) Earliest start time (ii) Latest finish time
03
(b) Explain (i) Balance sheet (ii) Working capital
04
(c) Discuss Principles and various steps in accounting process
07
Q.5 (a) Explain ABC Analysis of Inventory control for material management
03
(b) Explain A-O-A and A-O-N Network
04
(c) What is TQM ? Describe Principles of TQM
07
1
Q.6 (a) Give Advantages of Quality control
03
(b) Explain Building Block of TQM
04
(c) Explain EOQ Model for material procurement
07
Q.7 (a) Explain value Engineering
03
(b) Prepare Job Layout for seven storeyed building .
04
(c) Describe (i) causes of accidents and ( ii) Contractor as stakeholder of
07
construction Industry .
Q.8 (a) Explain principles of safety
03
(b) Explain graphical method of linear programming .
04
(c) Explain Success attributes for project performance evaluation .
07
*************
2
This post was last modified on 04 March 2021