PTU B.Tech Industry Engineering 3rd Semester May 2019 61011 OPERATIONS MANAGEMENT Question Papers

PTU Punjab Technical University B-Tech May 2019 Question Papers 3rd Semester Industry-Engineering

Roll No.
Total No. of Pages : 02
Total No. of Questions : 09
B.Tech. (Ind. Engg. & Mgt.) (Spl. in TQM) (Sem.?3)
OPERATIONS MANAGEMENT
Subject Code : IEM-301
M.Code : 61011
Time : 3 Hrs. Max. Marks : 40

INSTRUCTIONS TO CANDIDATES :
1.
Attempt All EIGHT questions from SECT ION-A carrying T WO marks each.
2.
Attempt any SIX questions out of EIGHT from SECT ION-B carrying FOUR marks
each.









SECTION-A
Q1. Answer briefly :

a) Explain the functions of operations management.

b) Discuss the centre of gravity method of facilities location.

c) What are the advantages of computer packages in plant layout?

d) "Material Handling is considered necessary evil" Comment.

e) Explain "Delphi Technique of Forecasting".

f) Differentiate between design capacity, system capacity and installed capacity.

g) Define MRP, CRP and BOM.

h) What do you understand by dispatching and reporting?
SECTION-B
Q2. Differentiate between batch, job and continuous production systems.
Q3. Explain the factors that influence the location of sugar industries. Justify your answer.
1 | M-61011

(S109)-3023


Q4. Differentiate in brief between product, process, group technology and fixed position layout.
Q5. State for what applications the following material handling equipments are used :

a) Fork lift truck

b) Jib crane

c) Belt conveyor

d) Roller conveyor
Q6. The following data relates the cost of production and sales prices :


2004
2005
2006
2007
2008
2009
2010
2011
2012
Costs
203
216
223
239
248
253
279
301
311
Prices 225
242
250
271
275
277
295
318
329

Establish the co-efficient of correlation between costs and prices.
Q7. Discuss in detail the use of decision tree for capacity planning.
Q8. Elaborate the following :

a) ERP

b) Master production schedule
Q9. Five jobs are to be processed on two machines M1 and M2 in the order M1M2. Processing
times in hours are given below :
Job
Processing times (hrs)

Machine M1
Machine M2
1
5
2
2
1
6
3
9
7
4
3
8
5
10
4

Determine the sequence that minimizes total elapsed time. Find out the total elapsed time
and idle time (if any) on M2.
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any
page of Answer Sheet will lead to UMC against the Student.
2 | M-61011

(S109)-3023


This post was last modified on 04 November 2019