FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

PTU B.Tech ECE 6th Semester May 2019 71237 SOFTWARE PROJECT MANAGEMENT Question Papers

PTU Punjab Technical University B-Tech May 2019 Question Papers 6th Semester Electronic and Communication Engineering (ECE)

This post was last modified on 04 November 2019

PTU B.Tech 6th Semester Last 10 Years 2009-2019 Previous Question Papers|| Punjab Technical University


Roll No.

Total No. of Pages : 02

Total No. of Questions : 09

--- Content provided by⁠ FirstRanker.com ---

B.Tech.(ECE/ETE) (E-I 2011 Onwards) (Sem.-6)

SOFTWARE PROJECT MANAGEMENT

Subject Code : BTIT-702

M.Code : 71237

Time : 3 Hrs.

--- Content provided by‍ FirstRanker.com ---

Max. Marks : 60

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
  4. --- Content provided by⁠ FirstRanker.com ---

SECTION-A

Q1. Answer briefly :

  1. What are planned events?
  2. Discuss project schedule.
  3. What is the role of verification team?
  4. --- Content provided by‌ FirstRanker.com ---

  5. IEEE standards for documentation.
  6. ISO auditing quality system guidelines.
  7. What is change control?
  8. What is total quality system?
  9. ISO 9000 registration process.
  10. --- Content provided by‌ FirstRanker.com ---

  11. What is Project milestone?
  12. Discuss the impact of cost estimation.

FirstRanker.com

SECTION-B

Q2. Which are the controlling activities and disciplines to support software evolution?

--- Content provided by​ FirstRanker.com ---

Q3. Discuss the advantage of oral presentation to present project documentation in an organization.

Q4. How SEI CMM helps to improve software development process?

Q5. Define Risk Analysis. Which are the potential risks during planning of project?

Q6. List the role of test and evaluation team in software project.

SECTION-C

--- Content provided by‍ FirstRanker.com ---

Q7. Explain the stages of software product life cycle from initial stage to retirement stage.

Q8. What is the main aim of Software Configuration Management SCM? How it is used for maintaining product integrity?

Q9. Discuss how ISO 9000 provides the guidelines for Software Quality Requirements and Evaluation.

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

FirstRanker.com

--- Content provided by​ FirstRanker.com ---



This download link is referred from the post: PTU B.Tech 6th Semester Last 10 Years 2009-2019 Previous Question Papers|| Punjab Technical University

--- Content provided by‍ FirstRanker.com ---