FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTUH MBA 2018 May 2nd Semester Operations Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) R16 2018 May Second Semester (2nd Sem) Operations Management Question Paper.

This post was last modified on 04 December 2019

This download link is referred from the post: JNTUH MBA 2nd Sem Last 10 Year Question Papers (2010-2020) All Regulation - (JNTU Hyderabad)


Hall Ticket No

Question Paper Code: CMB007

MBA II Semester End Examinations (Regular) - May/June, 2018

--- Content provided by FirstRanker.com ---

Operations Management

(MBA)

Answer ONE Question from each Unit

All Questions Carry Equal Marks

All parts of the question must be answered in one place only

--- Content provided by FirstRanker.com ---

Time: 3 Hours

Max Marks: 70


UNIT I

  1. (a) Describe the classification of production system based on the volume of production. [7M]
    (b) "Operations Management is an interdependent function" Substantiate. [7M]
  2. (a) Define process design. Discuss about the factors influencing the process design. [7M]

    --- Content provided by FirstRanker.com ---

    (b) Define process planning? Differentiate between process design and operations design. [7M]

UNIT - II

  1. (a) Discuss the merits and demerits of product and process layout. [7M]
    (b) Define the term location. Discuss the factors which determine the location of a plant. [7M]
  2. (a) Suggest the type of layout for following industries
    1. cement manufacturing
    2. Colgate tooth paste
    3. --- Content provided by FirstRanker.com ---

    4. Aircraft Assembly
    5. Ready made apparels
    6. Sugar
    7. Coke can
    8. Furniture manufacturing
    9. --- Content provided by FirstRanker.com ---

    [7M]
    (b) Find the optimal sequence of n jobs 3 machine case for data given in Table 1. [7M]
    Table 1
    123456789101112
    M1283042185119326023411820
    M287769871011879
    M3363542156024273243282438

UNIT III

  1. (a) Discuss various types of control chart used for Variables and Attributes. [7M]
    (b) Comment whether the following process in under control or not by calculating limits with suitable attributes given in Table 2. [7M]
    Batch No.DefectivesBatch No.Defectives
    112623
    2877
    311810
    414916
    512106
  2. --- Content provided by FirstRanker.com ---

  3. (a) State the objectives of work measurement. What are its benefits? [7M]
    (b) A work study practitioner who conducted a work sampling study assesses the activity level of a worker to be 70%, during the space of 8 hours working, this worker turns out 320 components. If the company policy is to inflate the normal time arrived at by work sampling study by 20%, what should be allowed time per unit [7M]

UNIT - IV

  1. (a) Describe the bath tub curve concept of maintenance. [7M]
    (b) Your college is planning to issue uniforms to its entire 1000 employees. Uniform shirt and pant are available in market for Rs 1000/- irrespective of the size. Fashion design department is given challenge to stitch the same. The details are worked out as follows; The fixed cost is Rs.3.0 Lakhs and variable cost per set total is Rs.700/-. Suggest which option is best? At what quantity it is profitable to make? [7M]
  2. (a) Write a note on suppliers make or buy decision? [7M]

    --- Content provided by FirstRanker.com ---

    (b) The details of 3 vendors supplying the same raw materials is given in Table 3. Select weight-age of 20 for quality, 20 for payment terms, 20 for delivery time, 20 for the price and 20 for suggestion implemented. [7M]
    Table 3
    FactorVendor AVendor BVendor C
    Quantity supplied100200350
    Quantity rejected102545
    Price/unit10/-11/-9/-
    Actual delivery465
    Promised delivery555
    Payment terms30days credit90days credit45 days credit
    Suggestions implemented215
    Suggestion given5530

UNIT - V

  1. (a) Describe the concept of ABC analysis of inventory control technique. [7M]
    (b) Identify which of the following critical items to be monitored in Table 4 inventory management by ABC analysis. [7M]
    Table 4
    PartValue(Rs)PartValue(Rs)PartValue(Rs)
    P130,000/-P224000/-P31500/-
    P45000/-P532000/-P67000/-
    P712000/-P810000/-P940000/-
  2. --- Content provided by FirstRanker.com ---

  3. (a) What is value analysis? Describe the potential benefit of value analysis. [7M]
    (b) What is stores management ? Discuss the objectives of stores management. [7M]