Code: 13A01801
B.Tech IV Year II Semester (R13) Advanced Supplementary Examinations July 2018
--- Content provided by FirstRanker.com ---
URBAN TRANSPORTATION PLANNING
(Civil Engineering)
--- Content provided by FirstRanker.com ---
Time: 3 hours Max. Marks: 70
PART - A
(Compulsory Question)
--- Content provided by FirstRanker.com ---
Answer the following: (10 X 02 = 20 Marks)
- What are the characteristics of a trip and how do you divide a trip?
- What is the sampling size recommended by BPR for home interview survey?
- What is the expression used for expanding a sample?
- List out the various types of travel demand estimation techniques.
- Explain trip generation and trip attractions with suitable examples.
- A zone is having 300 households with access to car ownership and another 150 without car ownership and the average trip rates are 4 and 2 for each category respectively. Assuming the future households will have same distribution with and without car ownership as per the current situation, there will be an addition of another 600 households. Find out the growth factor and total no of future trips from that zone.
- What is the use of Probit model?
- What are the various parameters used for developing diversion curves?
- Explain briefly about sinking fund factor.
- Discuss about discount rates adopted in the evaluation transportation projects.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
PART - B
(Answer all five units, 5 X 10 = 50 Marks)
UNIT - I
--- Content provided by FirstRanker.com ---
- Discuss about the assumptions made in the travel demand forecasting.
OR
- What do you understand about travel demand? Explain briefly.
--- Content provided by FirstRanker.com ---
UNIT - II
- Explain briefly about identifying study area and dividing into traffic zones.
OR
- Explain the method of organizing home interview method.
--- Content provided by FirstRanker.com ---
UNIT - III
--- Content provided by FirstRanker.com ---
- The following data is obtained from a four zone traffic study for a base year and work out the future trips using Furness method.
D O | Base year trips zone wise | Predicted --- Content provided by FirstRanker.com --- future trips | |||
---|---|---|---|---|---|
1 | 2 | 3 | 4 | ||
1 | 10 | 12 | 15 | 23 | 175 |
2 | 14 | 16 | 30 | 15 | 225 |
3 | 20 | 16 | 18 | 10 | 120 |
4 | 16 | 24 | 7 | 22 | 108 |
Predicted future trips | 160 | 170 | 120 | 178 |
- OR
Develop the regression equation for the following data and justify the model.
--- Content provided by FirstRanker.com ---
S.no | Trips generated | House hold size |
---|---|---|
1 | 50 | 20 |
2 | 70 | 30 |
3 | 80 | 40 |
4 | 100 | 50 |
5 | 100 | 60 |
UNIT - IV
--- Content provided by FirstRanker.com ---
- Find the shortest path for the following network from node 1 to all other nodes. The travel times in minutes are indicated in the network.
The following utility function is used in a mode choice case.
Uk = Ak -0.05 Ta-0.04Tw-0.02T -0.01C
--- Content provided by FirstRanker.com ---
Where Ta is the access time, Tw is the waiting time, Tt is the travel time and C is the travel out of pocket cost. Apply the logit model to calculate the division of usage between motorized two wheeler (Ak = -0.004) and the bus (Ak = -0.4) per the data given below. Estimate the shift in the patronage that would result in doubling the bus out of travel cost.Mode | Ta minutes | Tw minutes | Tt minutes | C Rupees |
---|---|---|---|---|
Motorized two wheeler | 10 | 0 | 45 | 50 |
Bus | 25 | 12 | 200 | 140 |
UNIT - V
--- Content provided by FirstRanker.com ---
- Compare various methods of Economic evaluation
OR
- A single lane road is 60 km long to be improved to two lane at a cost 12.0 lakhs per km, including all improvements. The cost of operation of the single lane road is Rs. 2.3 per vehicle km where as it is Rs. 1.9 per vehicle km on the improved facility. The average traffic may be assumed as 3000 vehicles per day for a design period of 20 years. The interest rate is assumed as 9% per year. The cost of maintenance is Rs.10000 per km on the improved road. Is the investment in the improvement scheme worthwhile.