Download JNTUA B.Tech 4-2 R15 2019 April Regular 15A03804 Power Plant Engineering Question Paper

Download JNTUA (JNTU Anantapur) B.Tech R15 (Bachelor of Technology) 4th Year 2nd Semester 2019 April Regular 15A03804 Power Plant Engineering Previous Question Paper || Download B-Tech 4th Year 2nd Sem 15A03804 Power Plant Engineering Question Paper || JNTU Anantapur B.Tech 4-2 Previous Question Paper || JNTU Anantapur B.Tech ME 4-2 Previous Question Paper || JNTU Anantapur B.Tech CSE 4-2 Previous Question Paper || JNTU Anantapur B.Tech Mech 4-2 Previous Question Paper || JNTU Anantapur B.Tech EEE 4-2 Previous Question Paper || JNTU Anantapur B.Tech ECE 4-2 Previous Question Paper

This post was last modified on 10 September 2020

JNTU Anantapur B-Tech 4-2 last 10 year question papers 2010 -2020 -All regulation- All branches- 4th Year 2nd Sem


Firstranker's choice

Code: 15A03804

FirstRanker.com

--- Content provided by FirstRanker.com ---

B.Tech IV Year II Semester (R15) Regular Examinations April 2019

POWER PLANT ENGINEERING

(Mechanical Engineering)

Time: 3 hours

Max. Marks: 70

--- Content provided by​ FirstRanker.com ---

PART - A

(Compulsory Question)

  1. Answer the following: (10 X 02 = 20 Marks)
    1. Explain nuclear fission.
    2. Give a note on pollutants of power plants.
    3. Explain coal handling equipment.
    4. --- Content provided by‍ FirstRanker.com ---

    5. List the important parameters for selection of site for a steam power plant.
    6. Sketch proper P-v and T-s diagrams for a diesel engine.
    7. Sketch proper T-s diagram for a two stage gas turbine power plant with intercooling.
    8. Define spill ways.
    9. Define catchment area.
    10. --- Content provided by​ FirstRanker.com ---

    11. What are the different methods of harnessing solar energy?
    12. What is heavy water? Explain.

PART - B

(Answer all five units, 5 X 10 = 50 Marks)

--- Content provided by‌ FirstRanker.com ---

UNIT - I

  1. (a) Define load factor and capacity factor.
    (b) A power plant of 210 MW installed capacity has the following particulars:
    Capital cost - Rs. 18,000 / kW installed
    Interest and depreciation - 12%

    --- Content provided by FirstRanker.com ---

    Annual load factor - 60%
    Annual capacity factor - 54%
    Annual running charges - Rs 200 x 106
    Energy consumed by power plant auxiliaries - 6%.
    Calculate: (i) The cost of power production per kWh. (ii) The reserve capacity.

    --- Content provided by‌ FirstRanker.com ---

    OR
  2. (a) Explain the significance of combined power cycles.
    (b) With a proper sketch, explain how MHD technique is used in power generation.

UNIT - II

  1. (a) List the different types of mechanical stokers and explain any one of them with proper sketch.

    --- Content provided by‌ FirstRanker.com ---

    (b) What is pulverization? How does it help in burning of coal?
    OR
  2. (a) Explain steam power plant with neat diagram.
    (b) Write a note on pollution from thermal power plants.

UNIT - III

--- Content provided by⁠ FirstRanker.com ---

  1. (a) Explain combustion chamber of an open cycle gas turbine plants.
    (b) List the different areas of application of diesel engines in power production. Also list the advantages of a diesel power plant.
    OR
  2. (a) Give layout of a low capacity diesel power plant and explain its function.
    (b) A gas turbine takes in air at 101 kN/m² and 15°C. The air is compressed to a pressure of 606 kN/m² and then passed through a regenerative heat exchanger of effectiveness 0.65. The air is then passed through the combustion chamber where the temperature is increased to 870°C by the combustion of fuel. The gases enter the turbine and are expanded to 101 kN/m² pressure. Assuming a compressor efficiency of 85% and a turbine efficiency of 80%, determine for an air flow rate of 4 kg/s: (i) The power output of the plant.

    --- Content provided by FirstRanker.com ---

    (ii) Exhaust temperature from heat exchanger.
    (iii) The thermal efficiency of the plant.
    (iv) The thermal efficiency of plant without heat exchanger.

UNIT - IV

  1. (a) Explain the different factors that are considered while selecting site for a hydro-electric power plant.

    --- Content provided by‌ FirstRanker.com ---

    (b) The mean monthly discharge for 12 months at a particular site of a river as given below:
    Month Discharge in millions m3 per month Month Discharge in millions m3 per month
    A (April) 500 O 2000
    M 200 N 1500
    J 2500 D 1000
    J 3000 I 800
    A 2400 F 600
    S 1500
    Draw: (i) Hydrograph for the given discharge and find the monthly average flow. (ii) The power available at mean flow of water if the available head is 80 m at the site and the overall efficiency of generation is 80%.
    OR
  2. (a) Explain storage and pondage of water.
    (b) Give complete note on working principle of a hydroelectric power plant with neat diagram.
  3. --- Content provided by‍ FirstRanker.com ---

UNIT - V

  1. (a) Explain how power is produced from wind energy.
    (b) Write a note on MHD power generation.
    OR
  2. (a) Sketch a general nuclear reactor and explain its components.

    --- Content provided by‌ FirstRanker.com ---

    (b) Write a brief note on tidal energy harvesting.