FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B-Tech ME 2020 Dec 6th Sem 71250 Power Plant Engineering Question Paper

Download PTU (I.K.Gujral Punjab Technical University (IKGPTU)) B-Tech (Bachelor of Technology) Mechanical Engineering 2020 December 6th Sem 71250 Power Plant Engineering Previous Question Paper

This post was last modified on 13 February 2021

PTU B.Tech Question Papers 2020 December (All Branches)


Roll No.

Total No. of Questions: 18

Total No. of Pages : 02

--- Content provided by⁠ FirstRanker.com ---

B.Tech. (ME) (E-I 2012 Onwards) (Sem.-6)

POWER PLANT ENGINEERING

Subject Code: DE/ME-1.8

M.Code: 71250

Time: 3 Hrs.

--- Content provided by⁠ FirstRanker.com ---

Max. Marks: 60

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
  4. --- Content provided by FirstRanker.com ---

SECTION-A

Answer briefly :

  1. What are commercial and non-commercial sources of energy?
  2. Enlist few direct energy conversion systems.
  3. What is difference between closed and open gas cycle?
  4. --- Content provided by‍ FirstRanker.com ---

  5. What are the different methods to measure rainfall?
  6. What is the use of draft tube in hydroelectric power plant?
  7. What is the working principle of cyclone dust collector?
  8. What is Fluidized bed combustion system?
  9. What is the function of grate in boiler?
  10. --- Content provided by‍ FirstRanker.com ---

  11. What are high pressure boilers? Enlist any two.
  12. Define Radioactivity.

SECTION-B

  1. Describe Electrostatic Precipitator for dust collection in a steam power plant.
  2. The yearly duration curve of a power plant is straight line from 150MW to 40MW. Power is supplied with one unit of 100MW and two units of 50MW capacity each. Determine:
    1. Installed capacity
    2. --- Content provided by FirstRanker.com ---

    3. Load factor
    4. Plant factor
    5. Utilization factor
  3. Explain the various combination cycles of gas turbine and steam plants for power production.
  4. --- Content provided by⁠ FirstRanker.com ---

  5. Explain performance and operating characteristics of power plant.
  6. Explain with diagram different equipments of coal preparation.

SECTION-C

  1. Describe the construction and working of a Pressurized - water reactor with neat diagram and explain its advantages and limitations.
  2. Explain various resources of geothermal energy.
  3. --- Content provided by​ FirstRanker.com ---

  4. Write short notes on:
    1. Electricity from city refuge
    2. Radioactive waste disposal.
    3. Flow duration curve

NOTE: Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

--- Content provided by‍ FirstRanker.com ---

FirstRanker.com



This download link is referred from the post: PTU B.Tech Question Papers 2020 December (All Branches)

--- Content provided by FirstRanker.com ---