B.Tech. (ME) (E-I 2012 Onwards) (Sem.-6)
OPTIMIZATION TECHNIQUES
Subject Code: DE/ME-3.2
M.Code: 71264
Time: 3 Hrs. Max. Marks: 60
--- Content provided by FirstRanker.com ---
INSTRUCTION TO CANDIDATES :
- SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
- SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
- SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
SECTION-A
--- Content provided by FirstRanker.com ---
Answer briefly :
- What do you mean by unbounded solution in graphical method?
- Define key row and key column in simplex method?
- What are the limitations of Graphical Method?
- Write the advantages of linear programming.
- Define assignment model.
- What is sensitivity analysis in assignment problem?
- Define total time in the system in queuing model.
- What do you understand by critical activities?
- List two uses of replacement model.
- Name any four mathematical models.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
SECTION-B
- Discuss probabilistic dynamic programming.
- Use Big M method to :
Minimize Z= 12X1+20X2
Subject to: 6X1 + 8X2 >= 100
--- Content provided by FirstRanker.com ---
7X1+12X2>= 120
X1, X2 >= 0
- Solve the assignment problem :
1 2 3 4 5 A 11 17 8 16 20 B 9 7 12 6 15 C 13 16 15 12 16 D 21 24 17 28 26 E 14 10 12 11 13 - Find the cost per period of individual replacement policy of an installation of 300 lights bulbs, given the following:
a) Cost of replacing individual bulb is Rs. 2.
--- Content provided by FirstRanker.com ---
b) Conditional probability of failure:
Week No. 0 1 2 3 4 Conditional probability of failure : 0 0.1 0.3 0.7 1 Also calculate the number of light bulbs that would fail during each of the four weeks.
- Define Feasible solution, Basic Feasible solution, Optimal solution, Non-Degenerate Basic Feasible solution and Degenerate Basic Feasible solution in Transportation problem.
SECTION-C
--- Content provided by FirstRanker.com ---
- Discuss sensitivity analysis of models.
- Explain Two Phase method in detail.
- A Project schedule has the following characteristics :
Activity to tm tp 1-2 1 1 7 1-3 1 4 7 1-4 2 2 8 2-5 1 1 1 3-5 2 5 14 5-6 3 6 15 4-6 2 5 8 a) Draw the project network and identify all the path through it.
b) Compute Expected project length.
c) Calculate standard deviation and variance.
--- Content provided by FirstRanker.com ---
d) What is the probability that the project will be completed no more than 4 weeks later than expected?
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.