Download PTU B-Tech Industrial Engineering 2020 Dec 3rd Sem 61011 Operations Management Question Paper

Download PTU (I.K.Gujral Punjab Technical University (IKGPTU)) B-Tech (Bachelor of Technology) (IE)- Industrial Engineering 2020 December 3rd Sem 61011 Operations Management Previous Question Paper

Roll No.
Total No. of Pages : 02
Total No. of Questions : 16
B.Tech. (Ind. Engg. & Mgt. (TQM) (Sem.?3)
OPERATIONS MANAGEMENT
Subject Code : IEM-301
M.Code : 61011
Time : 3 Hrs. Max. Marks : 40
INST RUCT IONS T O CAND IDAT ES :
1 .
Attempt All EIGH T Questions from SECT ION -A c arrying T WO mark s each .
2 .
Attempt any SIX q ues tions out of EIGHT from SECT ION -B ca rrying FOUR marks
each.
SECTION-A
1)
Differentiate between batch and continuous production systems.
2)
Give the advantages of urban and rural locations.
3)
Explain the concept of Group technology layout.
4)
Give the factors that influence the selection of material handling equipment.
5)
Investigate the need of forecasting in organizations.
6)
State the differences between design capacity and rated capacity.
7)
Explain master production schedule with the help of an example.
8)
What do you understand by critical ratio in scheduling? Give example.
SECTION-B
9)
Explain various functions of operations management.
10) What are the factors that influence the selection of location for a plant?
11) Elaborate various types of office layouts.
1 | M- 61011
472

12) Differentiate between fixed path, flexible path and auxiliary material handling systems.
13) What is time series analysis? How the forecast is made from the time series?
14) Discuss the steps involved in capacity planning.
15) Investigate in brief the concept of ERP.
16) State the differences between routing, scheduling and dispatching.
NOTE : Disclosure of Identity by writing Mobile No. or Marking of passing request on any
paper of Answer Sheet will lead to UMC against the Student.
2 | M- 61011
472

This post was last modified on 13 February 2021