Download PTU M.Tech. Civil Engg 1st Semester 74238 HYDROLOGICAL PROCESSES Question Paper

Download PTU. I.K. Gujral Punjab Technical University (IKGPTU) M.Tech. Civil Engg 1st Semester 74238 HYDROLOGICAL PROCESSES Question Paper.

1 | M-74238 (S9)-1033

Roll No. Total No. of Pages : 01
Total No. of Questions : 08
M.Tech (Civil Engg) (2016 Batch) (Sem.?1)
HYDROLOGICAL PROCESSES
Subject Code : MTCE-202
M.Code : 74238
Time : 3 Hrs. Max. Marks : 100

INSTRUCTIONS TO CANDIDATES :
1. Attempt any FIVE questions out of EIGHT questions.
2. Each question carries TWENTY marks.

Q1. Explain various conceptual models to develop IUH.
Q2. Distinguish between :
(a) Hydraulic and Hydrologic method of flood routing.
(b) Hydrologic storage and Hydrologic channel routing.
Q3. Explain briefly the basic principles involved in the development of IUH by :
(a) Clark?s method
(b) Nash?s model.
Q4. Give the uses and limitations of Unit hydrograph. The IUH of a catchment is a triangle with
a base of 36 h and a peak of 20 m
3
/s at 8h from the start. Derive a 2-h unit hydrograph for
this catchment.
Q5. Derive the basic differential equation governing unsteady groundwater flow in a
homogenous isotropic confined aquifer. State clearly the assumptions involved.
Q6. A confined horizontal aquifer of thickness 15m and permeability K= 20m/day, connects
two reservoirs M and N situated 1.5 km apart. The elevations of the water surface in
reservoirs M and N measured from the top of the aquifer, are 30.00 m and 10.00 m
respectively. If the reservoir M is polluted by a contaminant suddenly, how long will it take
the contaminant to reach the reservoir N? Assume the porosity of the aquifer n = 0.30
Q7. A 45 cm well penetrates an unconfined aquifer of saturated thickness 30m completely.
Under a steady pumping rate for a long time the drawdown at two observation wells 15 and
30m from the well are 5.0 and 4.2m respectively. If the permeability of the aquifer is
20m/day, determine the discharge and the drawdown at the pumping well.
Q8. What are the various methods of groundwater recharge? How is groundwater recharge
estimated?
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any
page of Answer Sheet will lead to UMC against the Student.
FirstRanker.com - FirstRanker's Choice

This post was last modified on 13 December 2019