M.Tech.(EE) (2013 Batch) (Sem.-2)
ADVANCED RELAYING AND PROTECTION
Subject Code : MTEE-202
M.Code: 71357
Time: 3 Hrs.
--- Content provided by FirstRanker.com ---
Max. Marks : 100
INSTRUCTIONS TO CANDIDATES :
- Attempt any FIVE questions out of EIGHT questions.
- Each question carries TWENTY marks.
Q1. (a) What are important terminology used in protective relaying? Brief them.
--- Content provided by FirstRanker.com ---
(b) Design factor affecting performance of a protective scheme.
(c) What are differences between static and digital numerical relaying?
(d) What are importance of instrument transformers?
Q2. A 3 phase alternator has the line voltage of 11KV. The generator is connected to a C B. The inductive reactance up to the CB is 5 Ohm/ phase. The distributed capacitance up- to CB between phase and neutral is 0.01 micro F. Determine :
(a) Peak re-striking voltage across the CB
--- Content provided by FirstRanker.com ---
(b) Frequency of restriking voltage transient
(c) Maximum RRRV.
Q3. (a) Compare the principle of directional, current and differential relaying protection.
(b) Explain the characteristics of distance relaying in power system.
Q4. A 3 phase, 2 pole, 11KV, 10 MVA alternator has neutral earthed through a resistance of 7 Ohm. The machine has current balance protection which operates at out of balance current exceeding 20% of full load. Determine % of winding protected against earth fault.
--- Content provided by FirstRanker.com ---
Q5. (a) Draw and explain various protection schemes for a motor.
(b) Explain the methods for bus bar protection using digital scheme.
Q6. (a) What are basic elements of digital protection scheme implementation?
(b) Write important software programs (flowcharts) required for load shading.
Q7. (a) Explain methods of testing of relaying system.
--- Content provided by FirstRanker.com ---
(b) Explain hardware and software for implementation of digital data transmission.
Q8. Write short notes :
(a) SCADA system
(b) Frequency relaying
(c) IDMT Characteristics
--- Content provided by FirstRanker.com ---
(d) Pilot wire.
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.