Download PTU. I.K. Gujral Punjab Technical University (IKGPTU) M.Tech. CAD-CAM 2nd Semester 23515 MANAGEMENT OF PRODUCTION SYSTEMS Question Paper.
Roll No. Total No. of Pages : 01
Total No. of Questions : 08
M.Tech.(CAD/CAM) (E-III) (Sem.?2)
MANAGEMENT OF PRODUCTION SYSTEMS
Subject Code : ME-516
M.Code : 23515
Time : 3 Hrs. Max. Marks : 100
INSTRUCTION TO CANDIDATES :
1. Attempt any FIVE questions out of EIGHT questions.
2. Each question carries TWENTY marks.
Q1. What is meant by Facilities management and explain its benefits?
Q2. What is a job shop? Outline and describe the critical parameters of the job shop scheduling
problem.
Q3. Explain the Concepts of :
a) PERT
b) CPM, by illustrating with examples and drawing the networks.
Q4. a) How does a good plant layout help to improve productivity?
b) Discuss the following statement ?Some industries are located near the source of raw
materials, whereas some near the markets for finished goods?.
Q5. a) Why is an ISO 9000 certification important to a firm? What are the advantages to the
firm? Explain.
b) Is TQM more applicable in manufacturing industry as compared to service industry?
Discuss.
Q6. Explain different types of internet B2B exchanges used for e-procurement. How they
improve the Production system?
Q7. Discuss role of Forecasting in Production system. Brief the forecasting methods.
Q8. Define Economic Order Quantity (EOQ). Explain with a suitable example along with its
importance and limitations.
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any
page of Answer Sheet will lead to UMC against the Student.
FirstRanker.com - FirstRanker's Choice
This post was last modified on 13 December 2019