Download GTU (Gujarat Technological University) MBA (Master of Business Administration) 2019 Summer 2nd Sem 2820006 Production And Operations Management Pom Previous Question Paper
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
MBA ? SEMESTER 2 ? EXAMINATION ? SUMMER 2019
Subject Code: 2820006 Date: 16/05/2019
Subject Name: Production and Operations Management (POM)
Time: 10:30 AM To 05:30 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q. 1 (a) Multiple Choice Questions: 06
1 In projects the network analysis is done to:
A. Minimize total duration B. Minimize total project cost
C. Minimize delays, interruptions
and conflict
D. All of the above
2. The technique of relationship diagramming is used for:
A. Product layout B. Process Layout
C. Block diagraming D All of the above
3. ?The lead Time? concept in Inventory Management means:
A. Float time B. Extra time given to the
production department
C. Time between placing an order
and receiving material
D. None of the above
4. The criteria of awarding OHSAS 18001 Certificate is:
A. Healthy and safe Management B. Quality Management
C. Conservation of the
environment
D. Time Management
5. The benefits of Production & Operations Management are for:
A. Manufacturing Organization
only
B. Service organizations only
C. Manufacturing and service
organizations
D. All the organizations expect
service organization
6. The primary consideration while assigning operators to machines is:
A. Most jobs waiting to be
processed
B. Jobs with the earliest due date
C. Jobs which have been waiting
the longest
D. All of the above
Q.1 (b)
(1)
(2)
(3)
(4)
Briefly Explain the following terms:
Gantt Chart
Project Crashing
Re-ordering level in Inventory Management
Fixed Position layout
04
Q.1 (c) Write a short note on ?Safety Management? 04
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
MBA ? SEMESTER 2 ? EXAMINATION ? SUMMER 2019
Subject Code: 2820006 Date: 16/05/2019
Subject Name: Production and Operations Management (POM)
Time: 10:30 AM To 05:30 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q. 1 (a) Multiple Choice Questions: 06
1 In projects the network analysis is done to:
A. Minimize total duration B. Minimize total project cost
C. Minimize delays, interruptions
and conflict
D. All of the above
2. The technique of relationship diagramming is used for:
A. Product layout B. Process Layout
C. Block diagraming D All of the above
3. ?The lead Time? concept in Inventory Management means:
A. Float time B. Extra time given to the
production department
C. Time between placing an order
and receiving material
D. None of the above
4. The criteria of awarding OHSAS 18001 Certificate is:
A. Healthy and safe Management B. Quality Management
C. Conservation of the
environment
D. Time Management
5. The benefits of Production & Operations Management are for:
A. Manufacturing Organization
only
B. Service organizations only
C. Manufacturing and service
organizations
D. All the organizations expect
service organization
6. The primary consideration while assigning operators to machines is:
A. Most jobs waiting to be
processed
B. Jobs with the earliest due date
C. Jobs which have been waiting
the longest
D. All of the above
Q.1 (b)
(1)
(2)
(3)
(4)
Briefly Explain the following terms:
Gantt Chart
Project Crashing
Re-ordering level in Inventory Management
Fixed Position layout
04
Q.1 (c) Write a short note on ?Safety Management? 04
2
Q.2 (a) Define Production and Operations management and explain
function/Activities of Operations
07
(b) Elaborate location selection factors for choosing a country and for the site
within country.
07
OR
(b) Write a note on: The process & The benefits of Aggregate Production
Planning (APP)
07
Q.3 (a) Differentiate between the Production Layout & Process layout 07
(b) Write a note on: Production planning & control (PPC) 07
OR
Q.3 (a) Explain in detail the advantages and disadvantages related to economies of
scale
07
(b) A manufacturer is offered a component as pre the pricing schedule given
below:
(i) 1-199 : $ 70
(ii) 200-449 : $ 64
(iii) >450 : $ 57
? The company uses 1200 such components annually
? The annual carrying cost is $ 18 per unit
? Ordering cost is $ 300
Determine the quantity the firm should order.
07
Q.4 (a) Explain how input transformation output system work for
(i) A Departmental store
(ii) A college
07
(b) Explain following in detail
(i) Chase Strategy
(ii) Level production strategy
07
OR
Q.4 (a) Elaborate the method of adjusting capacity to meet the demand 07
(b) Crash the network to the minimum time possible
Calculate the crash time & The Crashing cost.
07
Activity time
(Week)
Activity Cost
(Rs)
Activity Normal Crash Normal Crash
1-2 28 20 2000 2480
1-3 25 18 1700 2190
1-4 44 40 2200 2400
2-4 22 18 1500 1820
3-4 18 12 1550 1730
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
MBA ? SEMESTER 2 ? EXAMINATION ? SUMMER 2019
Subject Code: 2820006 Date: 16/05/2019
Subject Name: Production and Operations Management (POM)
Time: 10:30 AM To 05:30 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q. 1 (a) Multiple Choice Questions: 06
1 In projects the network analysis is done to:
A. Minimize total duration B. Minimize total project cost
C. Minimize delays, interruptions
and conflict
D. All of the above
2. The technique of relationship diagramming is used for:
A. Product layout B. Process Layout
C. Block diagraming D All of the above
3. ?The lead Time? concept in Inventory Management means:
A. Float time B. Extra time given to the
production department
C. Time between placing an order
and receiving material
D. None of the above
4. The criteria of awarding OHSAS 18001 Certificate is:
A. Healthy and safe Management B. Quality Management
C. Conservation of the
environment
D. Time Management
5. The benefits of Production & Operations Management are for:
A. Manufacturing Organization
only
B. Service organizations only
C. Manufacturing and service
organizations
D. All the organizations expect
service organization
6. The primary consideration while assigning operators to machines is:
A. Most jobs waiting to be
processed
B. Jobs with the earliest due date
C. Jobs which have been waiting
the longest
D. All of the above
Q.1 (b)
(1)
(2)
(3)
(4)
Briefly Explain the following terms:
Gantt Chart
Project Crashing
Re-ordering level in Inventory Management
Fixed Position layout
04
Q.1 (c) Write a short note on ?Safety Management? 04
2
Q.2 (a) Define Production and Operations management and explain
function/Activities of Operations
07
(b) Elaborate location selection factors for choosing a country and for the site
within country.
07
OR
(b) Write a note on: The process & The benefits of Aggregate Production
Planning (APP)
07
Q.3 (a) Differentiate between the Production Layout & Process layout 07
(b) Write a note on: Production planning & control (PPC) 07
OR
Q.3 (a) Explain in detail the advantages and disadvantages related to economies of
scale
07
(b) A manufacturer is offered a component as pre the pricing schedule given
below:
(i) 1-199 : $ 70
(ii) 200-449 : $ 64
(iii) >450 : $ 57
? The company uses 1200 such components annually
? The annual carrying cost is $ 18 per unit
? Ordering cost is $ 300
Determine the quantity the firm should order.
07
Q.4 (a) Explain how input transformation output system work for
(i) A Departmental store
(ii) A college
07
(b) Explain following in detail
(i) Chase Strategy
(ii) Level production strategy
07
OR
Q.4 (a) Elaborate the method of adjusting capacity to meet the demand 07
(b) Crash the network to the minimum time possible
Calculate the crash time & The Crashing cost.
07
Activity time
(Week)
Activity Cost
(Rs)
Activity Normal Crash Normal Crash
1-2 28 20 2000 2480
1-3 25 18 1700 2190
1-4 44 40 2200 2400
2-4 22 18 1500 1820
3-4 18 12 1550 1730
3
Q.5 Case Study
A cabinet manufacturing company is planning to introduce a new model
of cabinet which requires the following tasks:
Task Description Task time
minute
A Prepare the wheels 10
B Mount the wheels 5
C Assemble the sides 15
D Attach the top 11
E Attach the base 10
F Insert the brackets 5
G Insert the shelves 5
H Attach the doors 10
I Attach the back panel 10
J Paint the unit 15
The wheels are mounted after the are prepared. The base cannot be
attached until the sides are assembled and the wheel mounted. The top
cannot be attached, nor the brackets insert until the sides are assembled.
the shelves are inserted after the brackets are installed. The back panel is
attached after the base and top are attached. The doors are attached after
the shelves are inserted and the top and base are attached. The unit is
painted after the back and door the attached.
a) Identify the immediate its predecessors of each task and draw
the network.
b) Find the critical path (s) and list the critical actives.
c) Obtain the earliest and latest start completion times of all the
activities and their total, free and independent floats
14
OR
Q.5 Case Study
Jain Brothers? use 10000 seat covers per year. The seat covers are procured
from Pavitra Manufacture at a unit price of Rs.50. The inventory carrying
cost are estimated at 20 percent and the ordering cost Rs.100 per order. If
the lead time for procurement is 14 calendar days, (if both companies
operate 6 days in a week,52 weeks in a year) and if the service level is 97.5
per cent
a) Compute reorder point and EOQ under a Q system.
b) Compute target level and reorder cycle under a P system.
c) Assume Standard deviation of daily demand at 20 unit.
14
*************
FirstRanker.com - FirstRanker's Choice
This post was last modified on 19 February 2020