FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU MBA 2018 Winter 3rs Sem 3539271 Project Management Question Paper

Download GTU (Gujarat Technological University) MBA (Master of Business Administration) 2018 Winter 3rs Sem 3539271 Project Management Previous Question Paper

This post was last modified on 19 February 2020

GTU MBA Last 10 Years 2010-2020 Question Papers || Gujarat Technological University


FirstRanker.com

Seat No.:

Subject Code: 3539271

--- Content provided by FirstRanker.com ---

Enrolment No.

GUJARAT TECHNOLOGICAL UNIVERSITY

MBA- SEMESTER- 3 - EXAMINATION — WINTER 2018

Subject Name: Project Management

Date: 07/12/2018

--- Content provided by FirstRanker.com ---

Time: 10:30am To 01:30pm

Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. --- Content provided by‍ FirstRanker.com ---

  4. Figures to the right indicate full marks.

Q1 Define the terms: 14

  1. Licensing
  2. Acquisition
  3. Diversification
  4. --- Content provided by⁠ FirstRanker.com ---

  5. Commercialization
  6. Product Development
  7. Growth
  8. Decline

Q2 (a) Projects are of different types - Explain the statement. 07

--- Content provided by‌ FirstRanker.com ---

(b) Which are the main causes of Project Failure? 07

OR

(b) Write a short-note on Phases of Project. 07

Q3 (a) Draw a Detailed Flowchart of the Project Formulation and Analysis Process. 07

(b) You wish to start a paper bag business, describe the checklist for a feasibility report. 07

--- Content provided by‍ FirstRanker.com ---

OR

Q3 (a) Location plays a vital role in selection of the project site. Explain it with appropriate real life corporate world example. 07

(b) Write a note on Financial aspect of Project Appraisal. 07

Q4 (a) How would an effective project leader, resolve the team conflict? 07

Q4 (b) A large scale industry needs huge funds, which are the different sources of finance for them? 07

--- Content provided by FirstRanker.com ---

OR

Q4 (a) ‘International trade is impossible to imagine without the assistance of Export-Import Bank’. Do you agree with this statement? Why or Why not? 07

Q4 (b) An entrepreneur of any business, needs money to run the business on daily basis, how would he manage the same? 07

Q5 (a) ‘A Project Manager has to play a versatile role’ - Explain the statement. 07

Q5 (b) Write a note on five stages of team development model. 07

--- Content provided by​ FirstRanker.com ---

OR

Q5 (a) An established company has decided to add a new product to its line. It will produce the product from its existing plant. Packaging will be subcontracted. A number of distributors selected on a geographical basis. Market research has indicated the volume expected and the size of sales force required. The steps shown in the following table are to be planned.

Draw an arrow diagram for this project.

Indicate the critical path.

For each non-critical activity, find the ES, EF, LS and LF.

--- Content provided by‍ FirstRanker.com ---

The precedence Relationships is explained through the diagram below:

Activity Description Time (Weeks)
a. Organize Sales Office 6
b. Hire Salesman 4
c. Train Salesman 7
d. Select Advertising Agency 2
e. Plan Advertising Campaign 4
f. Conduct Advertising Campaign 10
g. Design Package 2
h. Set up Packaging Facilities 10
i. Package Initial Stocks 6
j. Order Stock from Manufacturer 13
k. Select Distributors 9
L Sell to Distributors 3
m. Ship Stock 5

FirstRanker.com