FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU MBA 2018 Winter 2nd Sem Production And Operation Management Pom Question Paper

Download GTU (Gujarat Technological University) MBA (Master of Business Administration) 2018 Winter 2nd Sem Production And Operation Management Pom Previous Question Paper

This post was last modified on 19 February 2020

GTU MBA Last 10 Years 2010-2020 Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

MBA - SEMESTER 2 - EXAMINATION - WINTER 2018

--- Content provided by‍ FirstRanker.com ---

Subject code: 2820006 Date:01/01/2019

Subject Name: PRODUCTION AND OPERATION MANAGEMENT (POM)

Time: 02:30 pm to 05:30 pm Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 {a} Objective Questions. (All questions carry 1 mark each) 06

  1. Productivity is increasing, but both output and input decrease with input decreasing at a faster rate
    A} Kaizen B} Competitiveness

    --- Content provided by​ FirstRanker.com ---

    C} Just in Time D} Retrenching
  2. Translates corporate strategy into measurable objectives
    A} Hoshins B} Retrenching
    C} Policy deployment D} Balanced scorecard
  3. Constant amount ordered when inventory declined to predetermined level

    --- Content provided by‍ FirstRanker.com ---

    A} Continuous system B} Independent demand
    C} Dependent demand D} Periodic system
  4. Order placed for variable amount after fix passage of time
    A} Continuous system B} Independent demand
    C} Dependent demand D} Periodic system
  5. --- Content provided by‍ FirstRanker.com ---

  6. Production Planning includes
    A} Dispatching B} Inspection
    C} Routing D} Follow up
  7. Production Control includes
    A} Loading B} Dispatching

    --- Content provided by‌ FirstRanker.com ---

    C} Routing D} Scheduling

Q.1 {b} Explain the following terms. 04

  1. Bullwhip effect
  2. Push system & Pull system
  3. Dependent & independent Demand
  4. --- Content provided by‍ FirstRanker.com ---

  5. Chase plan & level output plan

Q.1 {c} List down dimensions for Quality of Services & manufactured products. 04

Q.2 {a} Differentiate between Order qualifier & Order winner. And briefly explain on what basis firm can position itself in the market? 07

Q.2 {b} Define aggregate production planning. Discuss various strategies of aggregate production planning. 07

OR

--- Content provided by⁠ FirstRanker.com ---

Q.2 {b} List out 14 principles of Deming and Deming Wheel in Detail. 07

Q.3 {a} What is transformation process? Give detail explanation of transformation process with example. 07

Q.3 {b} What do you mean by job sequencing? explain any 5 methods of job sequencing with example. 07

OR

Q.3 {b} Identify and explain various cost associated with inventory management. 07

--- Content provided by‌ FirstRanker.com ---

Q.4 {a} Briefly explain the seven elements to achieve waste eleminitation in JIT 07

Q.4 {b} Explain Theory of constraints (Drum-Buffer-Rope) with an example. 07

OR

Q.4 {b} What are the ISO 9000 & 14000 Principles? 07

Q.5 {a} Explain concept of six-sigma. Describe the steps of six sigma breakthrough strategy for quality improvement. 14

--- Content provided by FirstRanker.com ---

Q.5 {b} Identify the best location from the following information. Find out the Coordinate of new warehouse. 07

Plant P Q R S T
coordinate (x,y) | (20,10) (10,5) (15,10) (15,20) (5,20)
No. Per Trip 50 150 100 300 200

OR

--- Content provided by‍ FirstRanker.com ---

Q.5 {b} A project contains the following major activities, along with their time estimates for completion: 07

Activity | Precedence Time Estimates
(Months
a m b
A - 1 4 7

--- Content provided by FirstRanker.com ---

B A 2 6 7
C A,D 3 4 6
D A 6 12 14
E D 3 6 12
F B,C 6 8 16

--- Content provided by⁠ FirstRanker.com ---

G E,F 1 5 6

  1. Calculate the expected time and variance for each activity
  2. Draw the network diagram
  3. Calculate the early start, early finish times and late start, late finish times
  4. Show the critical path
  5. --- Content provided by‍ FirstRanker.com ---

  6. What is the probability that the project can start running in 34 weeks?

OR

List out safety measures to be ensured as per the law of industrial safety

A Company package chips in bags. The net weight of the chips in each bag is designed to be 200 grams, with tolerance of & 3. The packaging process results in bags with an average net weight of 201 grams and standard deviation of 0.9 grams. Find out the process capability ratio and process capability index.

FirstRanker.com

--- Content provided by​ FirstRanker.com ---



This download link is referred from the post: GTU MBA Last 10 Years 2010-2020 Question Papers || Gujarat Technological University

--- Content provided by⁠ FirstRanker.com ---