FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Winter 3rd Sem New 2130601 Surveying Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Winter 3rd Sem New 2130601 Surveying Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University


FirstRanker.com

Seat No.: Enrolment No.

GUJARAT TECHNOLOGICAL UNIVERSITY

--- Content provided by‍ FirstRanker.com ---

BE - SEMESTER- III (New) EXAMINATION — WINTER 2019
Subject Code: 2130601 Date: 28/11/2019
Subject Name: Surveying
Time: 02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

--- Content provided by FirstRanker.com ---

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. Figures to the right indicate full marks.
MARKS
Q.1 (a) Define the following terms: (i) Line of collimation, (ii) Departure, (iii) Latitude 03
(b) Draw a neat sketch of Transit vernier Theodolite showing its components. 04
(c) What is use of planimeter? When will you apply zero circle? How do you find the zero circle? 07
Q.2 (a) Define: Area
Convert: (i) 1 Hectare = ___ m². (ii) 1 Acres= ___ ft².
03
(b) Discuss the method of achieving horizontal and vertical control in setting out works. 04
(c) The following offsets were taken from a chain line to an irregular boundary line at an interval of 5m.

--- Content provided by‌ FirstRanker.com ---

1.20, 2.40, 3.60, 4.70, 3.10, 0.50, 1.00 m.
Compute the area by Simpson’s rule and Trapezoidal rule.
07
OR
(c) Find the capacity of a reservoir from the contour data given in below table. The scale of plan is 1:4000. Compute with both the methods. 07
Contour Area (cm²) Contour Area (cm²)
260 400 248 205
258 367.5 246 177.5
256 327.5 244 147.5
254 310 242 115
252 277.5 240 0
250 243.75
Q.3 (a) Define: (i) Deflection angle, (ii) Vertex, (iii) Point of tangency 03
(b) Enlist types of curves. Describe the method of setting out a circular curve by any method. 04
(c) How will you determine RL of an object when instrument axis of one station nearer to the object is at higher level than the other instrument station? 07
OR
Q.3 (a) Give following designation of a curve: (i) Tangent length, (ii) Length of the long chord, (iii) Length of curve. 03
(b) What is the field procedure of the long chord method in setting a curve. 04
(c) Apply method of offset for a railway alignment of a circular nature having radius of 800m and a deflection angle of 36°. Tabulate the ordinates from the long chord at 20m interval. 07
Q.4 (a) Briefly give reasons of errors in plan table survey. 03
(b) Derive the following relationship: d = 1718.9 x (C/R) minutes. 04
(c) An instrument was set up at a point 250m away from a high mast tower. Angle of elevation to the top of tower was 30°, and to the bottom was 3°. Calculate height of the Tower. 07
OR
Q.4 (a) Define Plane table surveying with its advantages and disadvantages. 03
(b) Explain the three-point problem and different methods of solving it. 04
(c) How will you perform direct leveling on steep ground? 07
Q.5 (a) What is closing error? How will you find it? 03
(b) What do you mean by Soundings in hydrographic survey? Where it is required? 04
(c) Enlist methods of theodolite traversing and explain any one of them in detail. 07
OR
Q.5 (a) What is least count? How will you find least count of an instrument? 03
(b) Why and how Gale’s Traverse table is widely used in traverse computation? 04
(c) The following are the lengths and bearings of the lines of a closed traverse. Find closing error and its direction. 07
Line Length (m) Bearing
AB 235.10 N21°40'W
BC 317.40 N52°22'E
CD 215.00 S13°00'E
DA 281.60 S79°40'W