FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Winter 7th Sem New 2170610 Professional Practices And Valuation Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Winter 7th Sem New 2170610 Professional Practices And Valuation Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER- VII (New) EXAMINATION — WINTER 2019

--- Content provided by​ FirstRanker.com ---

Subject Code: 2170610 Date: 03/12/2019

Subject Name: Professional Practices & Valuation

Time: 10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by⁠ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 (a) Write formulas for the following: (1) Area of Segment of Circle (2) Volume of 03 frustum of cone (3) Volume of sphere

(b) Define following terms — Estimate, Contingencies, Spot Item, Prime Cost 04

(c) For the following given figure a, calculate the quantities of following items by 07 Centre line method

--- Content provided by‌ FirstRanker.com ---

a) Earthwork in Excavation in foundation

b) Cement Concrete bed in Foundation

c) Brick masonry work in foundation up to plinth in cm 1:6.

Q.2 (a) Discuss accuracy criteria for concrete 03

(b) Compare revised estimate and supplementary estimate. 04

--- Content provided by‍ FirstRanker.com ---

(c) What is Contract? List out Various types of Special contract and explain 07 Turnkey Contract in detail.

OR

(c) Enlist different types of tenders & explain-anyone them 07

Q.3 (a) Provide the Prevailing market rate of the following materials in your city: 03

10 mm diameter MS Bar, Gully Trap, Kota Stone.

--- Content provided by‍ FirstRanker.com ---

(b) Define rate analysis. How we can fix rate per unit of item in rate analysis? 04

(c) Calculate the following: 07

  1. No. of bricks required for 5 cu. m. brickwork.
  2. Materials required for M20 Grade of Concrete

OR

--- Content provided by​ FirstRanker.com ---

Q.3 (a) Write short note on Schedule of rates (S.O.R) & Task of Work 03

(b) Differentiate between Estimation & Valuation 04

(c) Write short note on : 07

  1. Scrutiny of tender
  2. Classification of tender
  3. --- Content provided by⁠ FirstRanker.com ---

Q.4 (a) A person requires Rs. 20000 after 5 years for the repair of his house. What 03 amount he needs to invest at 7% to get required amount after said years?

(b) What should be the amount of loan instalment if loan amount is Rs. 12,00,000 04 to be paid at annual interest rate of 13.78 % in 363 months

(c) Calculate rent of newly constructed building from given data. 1) Cost of 07 Land=7,00,000 , 2) Cost of Construction = 5,50,000 , 3) Total outgoings including sinking fund = 15.8 % of GI , 4) Net return @ 10% on construction and 5% on Land

OR

FirstRanker.com

--- Content provided by FirstRanker.com ---

(a) What do you mean by High-Tech Building? List out different types of Valuation.

(b) Differentiate between Earnest Money Deposit & Security Deposit. 04

(c) Define the following terms: 1. Scrap value 2. Estimating 3. Cost 4. Salvage 07 value 5. Book Value 6. Free hold property 7. Lease hold property

Q.5 (a) Explain following terms — Liquidated Damages, Unbalanced Tender, 03 Arbitration

(b) Discuss various reasons for rejection of the lowest tender. 04

--- Content provided by FirstRanker.com ---

(c) Discuss mode of payment to the contractor. How the first and final bill, running 07 or interim bills are paid to contractor?

OR

Q.5 (a) Write difference between: 'Depreciation and Obsolescence.'

(b) Define specification. What are the purpose of writing 04

(c) Explain in brief various principles of writing good specifications 07

--- Content provided by​ FirstRanker.com ---

Figure: a

In figure: In section-AB consider data for section starting from pcc (from bottom) pcc : 0.9 m, of step 1: 0.6 m, of step 2: 0.5 m, of step 3: 0.4 m, wall : 0.2 m

FirstRanker.com


--- Content provided by‌ FirstRanker.com ---


This download link is referred from the post: GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University