FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Winter 7th Sem New 2171501 Operations Planning And Control Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Winter 7th Sem New 2171501 Operations Planning And Control Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER- VII (New) EXAMINATION — WINTER 2019

--- Content provided by⁠ FirstRanker.com ---

Subject Code: 2171501

Subject Name: Operations Planning & Control

Time: 10:30 AM TO 01:00 PM Date: 23/11/2019 Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‌ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 (a) What do you understand by Operations Planning & Control? 03

(b) Explain the scope of OPC. 04

--- Content provided by‍ FirstRanker.com ---

(c) Discuss principal functions of OPC. 07

Q.2 (a) What is process planning? 03

(b) Explain in short about Computer Integrated Manufacturing (CIM). 04

(c) Discuss salient distinguishing features of production planning for Batch, Continuous, and Job production. 07

OR

--- Content provided by‌ FirstRanker.com ---

(c) What is ‘Route sheet’? State how it differs from ‘Operation sheet’ of an engineering component. Also explain its significance for PPC. 07

Q.3 (a) What is sales forecasting? 03

(b) What do you understand by the term ‘Economic mfg. quantity’ (EMQ)? 04

(c) Use method of least squares to fit a straight line trend using following data, and find trend values. Also find expected values for year 2018 : 07

Year 2013 2014 2015 2016 2017

--- Content provided by⁠ FirstRanker.com ---

Sales 36 49 61 77 68 (Rs in Crores)

OR

Q.3 (a) What is dispatching? 03

(b) What are the elements of good sales forecasting method? 04

(c) An engineering company uses a special type of pin at an approximately constant rate of 5000 units per year. The pins are manufactured at the company’s own plant. Each pin costs the company Rs. 80. The setup cost per production run is Rs. 1600. The inventory carrying charges are estimated at 20% of the average inventory investment. 07

--- Content provided by FirstRanker.com ---

What quantity of pins should be manufactured in each production run for minimum cost? Also find out the frequency of production runs to be made.

Q.4 (a) Define Job sequencing and also scheduling. 03

(b) Discuss in short about MRP. 04

(c) The sequence of manufacturing a product is as follows: 07

Find out minimum no. of work stations and line efficiency:

--- Content provided by⁠ FirstRanker.com ---

Operation | A B C D E F G

Time 4 8 9 5 3 6 22 (In Min.)

OR

Q.4 (a) What is assembly line balancing? 03

(b) Explain the scope and importance of scheduling for any organization. 04

--- Content provided by‌ FirstRanker.com ---

(c) Schedule the following jobs on two machines using Johnson’s rule. Also evaluate makespan for the following data :

Job 1 2 3 4 5 6

Lathe 4 7 5 10 12 8

Shaping 5 8 4 9 7 6

Q.5 (a) What is Aggregate planning? 03

--- Content provided by​ FirstRanker.com ---

(b) State the application of Gantt chart and Machine load chart. 04

(c) Discuss modern day MPC system, its different inputs and outputs. 07

OR

Q.5 (a) What is master production scheduling? 03

(b) Discuss capacity planning with an example. 04

--- Content provided by​ FirstRanker.com ---

(c) Construct a MPS record for 8 week time horizon. Inventory on hand in first week is 10 units, MPS is 10 units for first 4 weeks, and 5 units for subsequent 4 weeks. Show inventory requirement (Production requirement) and discuss inventory build-up. 07

FirstRanker.com



--- Content provided by FirstRanker.com ---

This download link is referred from the post: GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University