--- Content provided by FirstRanker.com ---
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER- VII (New) EXAMINATION — WINTER 2019
Subject Code: 2172411 Date: 26/11/2019
--- Content provided by FirstRanker.com ---
Subject Name: Industrial Automation
Time: 10:30 AM TO 01:00 PM Total Marks: 70
--- Content provided by FirstRanker.com ---
Instructions:
- Attempt all questions.
- Make suitable assumptions wherever necessary.
- Figures to the right indicate full marks.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
Q.1 (a) What are the advantages of Automation? 03
(b) Compare PLC and DCS system. 04
(c) (1) Define Relay Logic and PLC. 07
--- Content provided by FirstRanker.com ---
(2) Explain advantages & limitations of DCS.
Q.2 (a) Explain in detail Component of Industrial Automation. 03
--- Content provided by FirstRanker.com ---
(b) Compare Localized Process and Distributed Process. 04(c) Draw P.L.C. system layout & explain the functionality of all inter- 07
connected parts.
--- Content provided by FirstRanker.com ---
OR
(c) Explain about DCS as an automation tool to support enterprise 07
--- Content provided by FirstRanker.com ---
resources planning.(E.R.P)Q.3 (a) Explain DCS Applications in Cement plant. 03
(b) List advantages and drawbacks of various types of Network Access 04
--- Content provided by FirstRanker.com ---
Protocols.
(c) Explain the PLC arithmetic functions and draw block format of 07
--- Content provided by FirstRanker.com ---
each.OR
Q.3 (a) Explain in brief Use of DCS in petroleum-refining environment. 03
--- Content provided by FirstRanker.com ---
(b) Explain in brief use of DCS in pulp and paper environment. 04
(c) Explain the different levels of DCS systems. 07
--- Content provided by FirstRanker.com ---
Q.4 (a) Explain data monitoring and data supervision. 03
(b) Explain in brief Data Logging & process survey. 04
(c) Define SCADA systems. Explain in details SCADA systems. 07
--- Content provided by FirstRanker.com ---
OR
Q.4 (a) Explain Error detection in SCADA system. 03
--- Content provided by FirstRanker.com ---
(b) Write a technical note on:- Application Areas of Automation 04System:
(c) Explain in detail the PLC Counter functions. 07
--- Content provided by FirstRanker.com ---
Q.5 (a) Explain System Reliability and Availability w.r.t. SCADA system 03
(b) Explain in brief Remote Terminal unit. 04
--- Content provided by FirstRanker.com ---
(c) Draw the timing diagram of retentive timer. Draw the timing 07diagram & write P.L.C.ladder logic equivalent of ON DELAY &
DUAL OFF DELAY timer.
--- Content provided by FirstRanker.com ---
OR
Q.5 (a) Explain in detail Master Terminal Unit. 03
--- Content provided by FirstRanker.com ---
(b) Explain in brief about Configuration of MTU. 04(c) Describe PLC scanning considerations in detail. 07
--- Content provided by FirstRanker.com ---
This download link is referred from the post: GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University
--- Content provided by FirstRanker.com ---