Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Winter 7th Sem New 2172502 Productivity Improvement Methods Previous Question Paper
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER ? VII (New) EXAMINATION ? WINTER 2019
Subject Code: 2172502 Date: 23/11/2019
Subject Name: Productivity Improvement Methods
Time: 10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
MARKS
Q.1 (a) Differentiate production and productivity in light of economic progress of
India. Take an example of ship breaking industries.
03
(b) Define flow process chart. Explain types of flow process chart. 04
(c) Define method study. Take an example of a manufacturing industry, and
discuss economic, technical and human factors? consideration in selection
of a job for study.
07
Q.2 (a) Write a brief note on construction of a SIMO chart. 03
(b) Write a brief note on Therbligs and PMTS. 04
(c) Discuss implementation methodology of BPR. Take a suitable example. 07
OR
(c) Discuss various causes of low productivity. Explain factors that help
increasing productivity.
07
Q.3 (a) Explain performance rating. 03
(b) Explain human behavior and equipment design in concern with
ergonomics.
04
(c) Write a detail note on motion economy. 07
OR
Q.3 (a) Discuss why it is considered crucial to know as to ?when to reengineer??. 03
(b) Discuss effect of environment on performance of worker, with suitable
illustration
04
(c) Discuss development of BPR. Write steps involved in BPR. 07
Q.4 (a) Define outline process chart. 03
(b) List methods of work measurement. 04
(c) Explain string diagram for productivity improvement. 07
OR
Q.4 (a) Define standard time. 03
(b) Write a brief note on allowances. 04
(c) Explain man-machine chart in detail. 07
Q.5 (a) Enlist time estimating techniques. 03
(b) Prepare a two handed process chart for filling ink in a fountain pen. 04
(c) Write a note on Contemporary issues in productivity. 07
OR
Q.5 (a) What is NPC? 03
(b) Discuss various incentive schemes followed by organization. 04
(c) Explain various methods used to determine the basic time required to
perform any operation from time study record
07
*************
FirstRanker.com - FirstRanker's Choice
This post was last modified on 20 February 2020