FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Winter 8th Sem New 2182506 Managing Projects Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Winter 8th Sem New 2182506 Managing Projects Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER- VIII (New) EXAMINATION — WINTER 2019

--- Content provided by FirstRanker.com ---

Subject Code: 2182506 Date: 25/11/2019
Subject Name: Managing Projects
Time: 02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‍ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

MARKS

Q.1 (a) Explain scope, schedule and cost in reference to project management. 03
(b) Explain guidelines for construction of network diagram. 04

--- Content provided by FirstRanker.com ---

(c) Differentiate two methods: CPM and PERT with its application 07

Q.2 (a) Draw the AOA network for the following project: 03
Activity A B C D E F G H
Predecessor - - A B A C D CDE F
(b) Explain budget uncertainty in project management. 04

--- Content provided by⁠ FirstRanker.com ---

(c) Explain project manager’s role and responsibility in project. 07

OR

(c) A project schedule has the following characteristics 07
Activity A B C D E F
Predecessor - A B A D C,E

--- Content provided by‍ FirstRanker.com ---

Duration(week) 5 6 5 4 3 4
Construct a network and find critical path, total duration of the project and calculate EST, LST; EFT and LFT.

Q.3 (a) Discuss about resource-allocation in project management. 03
(b) Explain project termination in brief. 04
(c) Define project management and explain how it differs from general management. 07

--- Content provided by‌ FirstRanker.com ---

OR

Q.3 (a) Discuss regarding cost variance in project. 03
(b) Explain in brief about project overview statement. 04
(c) Explain different elements of project planning. 07

Q.4 (a) Define following terms: 03

--- Content provided by‍ FirstRanker.com ---

(i) Optimistic time, (ii) Pessimistic time, (iii) Most likely time
(b) Explain budgeting of project in brief. 04
(c) Discuss work breakdown structure with suitable example. 07

OR

Q.4 (a) Explain about project cost estimation. 03

--- Content provided by FirstRanker.com ---

(b) Explain how project evaluation is useful in project management. 04
(c) Explain the process of project auditing. 07

Q.5 (a) Discuss about project action plan. 03
(b) Explain project scope creep in brief. 04
(c) What is resource leveling? How does it differ from resource smoothing? 07

--- Content provided by‍ FirstRanker.com ---

OR

Q.5 (a) Explain about crashing of cost in brief. 03
(b) Explain how the project team reflects on successful completion of project. 04
(c) Explain project management life cycle with neat sketch. 07

FirstRanker.com

--- Content provided by​ FirstRanker.com ---



This download link is referred from the post: GTU BE/B.Tech 2019 Winter Question Papers || Gujarat Technological University

--- Content provided by⁠ FirstRanker.com ---