Download GTU BE/B.Tech 2019 Summer 6th Sem New 2161503 Finance Management And Cost Control Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 6th Sem New 2161503 Finance Management And Cost Control Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
SEMESTER-VI(NEW) - EXAMINATION - SUMMER 2019

--- Content provided by‍ FirstRanker.com ---

Subject Code:2161503 Date:16/05/2019
Subject Name: Finance Management & Cost Control
Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:
1. Attempt all questions.

--- Content provided by​ FirstRanker.com ---

2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.

MARKS

Q.1 (a) Discuss depreciation of fixed assets. 03
(b) Differentiate costing and Engineering estimation 04

--- Content provided by‍ FirstRanker.com ---

(c) Discuss material cost estimation in a forging shop. 07

Q.2 (a) Discuss the financial accounting 03
(b) Discuss Journal, ledger and double entry book system. 04
(c) A factory producing 150 electric bulbs a day involves direct material 07
cost of Rs. 250 direct labour cost of Rs. 200 and factory overheads of

--- Content provided by‌ FirstRanker.com ---

Rs. 225. Assuming a profit of 10% of the selling price and selling on
cost (overhead) 30% of the factory cost, calculate the selling price of
one electric bulb.

OR

(c) Two molders can cast twenty — five gears in a day. Each gear weight 3 07

--- Content provided by‌ FirstRanker.com ---

kg and the gear material costs Rs. 12.50 per kg. If the overhead
expenses are 150% of direct labour cost and two molders are paid Rs.
70 per day, calculate the cost of producing one gear.

Q.3 (a) Give the limitations of budget. 03
(b) Define budgeting and budgetary control 04

--- Content provided by‍ FirstRanker.com ---

(c) Discuss the role of an industrial engineer as a cost controller. 07

OR

Q.3 (a) Discuss the objective of trial balance. 03
(b) Explain the objectives of budget, budgeting and budgetary control. 04
(c) Calculate a) cost of cutting a V- Groove with gas, b) welding cost for 07

--- Content provided by​ FirstRanker.com ---

two 1 m long M.S. plates of 8 mm thickness. If cost of Oxygen Rs.
10/m3 , Cost of Acetylene- Rs. 50/ m3, Cost of filler rod- Rs. 12/kg,
labour charges Rs..1.8/hr, 60 degree V-Groove is prepared for welding.
Assume cutting ‘speed= 20m/Hr., Oxygen consumption= 2 cu.m./Hr.,
Acetylene consumption= 0.2 cu.m./Hr

--- Content provided by FirstRanker.com ---

Q.4 (a) Discuss the nature of cost 03
(b) Explain various sources of finance for short and long term financing for 04
any large scale industry.
(c) (1) A sugar mill had its overheads of Rs. 60,000 while it purchased 07
sugarcane worth Rs. 2,40,000. Find the percentage overhead using the

--- Content provided by⁠ FirstRanker.com ---

percentage of direct material cost method. (i1) If a particular batch had a
direct material cost of Rs. 30,000 determine it overheads.

OR

Q.4 (a) Explain the single entry system 03
(b) Discuss various Classes of shares and debentures. 04

--- Content provided by‌ FirstRanker.com ---

(c) Write note: Ratio analysis and its importance. 07

Q.5 (a) Discuss Material costing. 03
(b) Discuss procedure/steps in calculating Welding material cost. 04
(c) A fabrication concern, for the year 1975-1976 had factory overheads of 07
Rs. 4,000, and the direct labour cost of Rs. 12,000. Find the percentage

--- Content provided by⁠ FirstRanker.com ---

overhead using percentage of direct labour cost method.

OR

Q.5 (a) Discuss allocation of overheads. 03
(b) Discuss basic elements of variable indirect expenses. 04
(c) A fabrication and assembly shop had its total overheads of Rs. 10,000. 07

--- Content provided by FirstRanker.com ---

It used direct material worth Rs. 10,000 and paid Rs. 15,000 as direct
labour charges. Calculate the % overhead.