Subject Code: 2162202
GUJARAT TECHNOLOGICAL UNIVERSITY
--- Content provided by FirstRanker.com ---
SEMESTER-VI(NEW) - EXAMINATION - SUMMER 2019Subject Name: Underground Metal Mining
Time: 10:30 AM TO 01:00 PM
Instructions:
--- Content provided by FirstRanker.com ---
1. Attempt all questions.2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1
--- Content provided by FirstRanker.com ---
(a) Define the following term: Cross cut, Chute, and Garages. MARKS 03(b) Describe classification of different stopping methods. MARKS 04
(c) Explain room and pillar method with neat sketch. MARKS 07
Q.2
--- Content provided by FirstRanker.com ---
(a) Describe present status of Indian metal mining industry. MARKS 03(b) Define the following term: Stope, Stoping, Crown pillar and Grizzlies. MARKS 04
(c) Explain top slicing stopping method with neat sketch. MARKS 07
OR
--- Content provided by FirstRanker.com ---
Explain sub-level stopping method with neat sketch. MARKS 07
Q.3
(a) Explain how working is carried out in metal mine when ore body is wide. MARKS 03
--- Content provided by FirstRanker.com ---
(b) Describe the basic fundamental of cut & fill method. MARKS 04(c) Explain under hand stopping method with neat sketch. MARKS 07
OR
--- Content provided by FirstRanker.com ---
Explain ore and waste bin with neat sketch. MARKS 03Q.4
(a) Differentiate between pneumatic and mechanical method of backfilling. MARKS 04
(b) Explain over hand stopping method with neat sketch. MARKS 07
--- Content provided by FirstRanker.com ---
Q.5
(a) Describe skip-pockets in details. MARKS 03
(b) Explain underground crushing. MARKS 04
(c) Discuss the various points to be considered for selection of stopping methods. MARKS 07
--- Content provided by FirstRanker.com ---
OR
List out the different types of backfilling methods used in metal mining. MARKS 03
--- Content provided by FirstRanker.com ---
Q.5(a) Explain hydraulic backfilling. MARKS 04
(b) Describe blast hole and vertical crater retreat method. MARKS 07
(c) Explain stopping of super-imposed veins and parallel ore bodies. MARKS 03
--- Content provided by FirstRanker.com ---
Q.5(a) Explain haulage and dumping. MARKS 04
(b) Write a note on construction of mine portal. MARKS 07
(c) Explain secondary breaking in brief. MARKS 03
--- Content provided by FirstRanker.com ---
ORDescribe design and construction of draw points. MARKS 04
Write a note on recovery and dilution. MARKS 07
--- Content provided by FirstRanker.com ---
Explain stope layouts and stop preparation work in underground metal mining. MARKS 03
Date: 10/05/2019
Total Marks: 70
--- Content provided by FirstRanker.com ---
This download link is referred from the post: GTU BE 2019 Summer Question Papers || Gujarat Technological University