FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 6th Sem Old 161701 Instrumentation System Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 6th Sem Old 161701 Instrumentation System Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
SEMESTER-VI(OLD) - EXAMINATION - SUMMER 2019

--- Content provided by‌ FirstRanker.com ---

Subject Code:161701 Date:18/05/2019
Subject Name: Instrumentation System
Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by⁠ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 (a) Sketch loop wiring diagram and Explain it in detail. 07
(b) Draw and Explain control room layout. 07

Q.2 (a) Explain air supply system in detail. 07

--- Content provided by⁠ FirstRanker.com ---

(b) Explain electric safety and explain about hazardous area. 07

OR

(b) Explain checklist for good installation practice. 07

Q.3 (a) Explain different communication methods used in plant control room. 07
(b) Explain different types of control panel in detail. 07

--- Content provided by‍ FirstRanker.com ---

OR

Q.3 (a) Explain various types of dryers and functions. 07
(b) Explain plant startup procedure. 07

Q.4 (a) Write a short note on capacitive type level measurement. 07
(b) Give the details of Diaphragm operated control valve. 07

--- Content provided by‌ FirstRanker.com ---

OR

Q.4 (a) Explain typical control valve checkout procedure. 07
(b) Prepare the specification sheet for pressure transmitter. 07

Q.5 (a) Explain role and responsibilities of project-manager. 07
(b) Describe the selection of measurement method for flow. 07

--- Content provided by‌ FirstRanker.com ---

OR

Q.5 (a) Give the checklist for good installation of temperature transmitter. 07
(b) Describe electrical power system for control room. 07


--- Content provided by‍ FirstRanker.com ---


This download link is referred from the post: GTU BE 2019 Summer Question Papers || Gujarat Technological University