Download GTU BE/B.Tech 2019 Summer 7th Sem New 2170503 Plant Design And Project Engineering Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 7th Sem New 2170503 Plant Design And Project Engineering Previous Question Paper

1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2170503 Date:16/05/2019

Subject Name:Plant Design & Project Engineering

Time:02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.


Q.1 (a) Discuss in brief role of a chemical engineer. 03
(b) What is Pilot Plant? State the importance of pilot plant. 04
(c) List types of flow diagrams and explain each with a neat sketch. 07

Q.2 (a) Draw a typical master plot plan of an industry. 03
(b) State and explain various factors for techno-economic feasibility survey of a
Chemical process plant.
04
(c) Discuss Importance of utilities in chemical industry. 07
OR
(c) Define layout of a plant. Discuss the principles of the storage layout and equipment
lay-out in a process plant.
07

Q.3 (a) Define: (1) Salvage value (2) Book value (3) Market Value 03
(b) Explain: (1) Battery limit (2) Grass Root Plant. 04
(c) State and discuss the factors to be considered in selection of the location of a
chemical plant.
07
OR
Q.3 (a) Write short note on pipe fittings 03
(b) Differentiate between Standard and Special equipment. 04
(c) What is optimum design? Explain ?breakeven chart? for production schedule and
its significance for optimum analysis.
07

Q.4 (a) Discuss selection of size reduction equipment. 03
(b) Write a brief note on ?Unit area concept?. 04
(c) Discuss various waste treatment and disposal methods. 07
OR
Q.4 (a) The capital cost of a 9 million tones per annum refinery is estimated at Rs.320 crores
in 1996 when cost index is 250.What would have been cost of 6 million tones per
annum refinery in 1992 when cost index was 200.
03
(b) Explain in brief the factors affecting investment and production cost. 04
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2170503 Date:16/05/2019

Subject Name:Plant Design & Project Engineering

Time:02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.


Q.1 (a) Discuss in brief role of a chemical engineer. 03
(b) What is Pilot Plant? State the importance of pilot plant. 04
(c) List types of flow diagrams and explain each with a neat sketch. 07

Q.2 (a) Draw a typical master plot plan of an industry. 03
(b) State and explain various factors for techno-economic feasibility survey of a
Chemical process plant.
04
(c) Discuss Importance of utilities in chemical industry. 07
OR
(c) Define layout of a plant. Discuss the principles of the storage layout and equipment
lay-out in a process plant.
07

Q.3 (a) Define: (1) Salvage value (2) Book value (3) Market Value 03
(b) Explain: (1) Battery limit (2) Grass Root Plant. 04
(c) State and discuss the factors to be considered in selection of the location of a
chemical plant.
07
OR
Q.3 (a) Write short note on pipe fittings 03
(b) Differentiate between Standard and Special equipment. 04
(c) What is optimum design? Explain ?breakeven chart? for production schedule and
its significance for optimum analysis.
07

Q.4 (a) Discuss selection of size reduction equipment. 03
(b) Write a brief note on ?Unit area concept?. 04
(c) Discuss various waste treatment and disposal methods. 07
OR
Q.4 (a) The capital cost of a 9 million tones per annum refinery is estimated at Rs.320 crores
in 1996 when cost index is 250.What would have been cost of 6 million tones per
annum refinery in 1992 when cost index was 200.
03
(b) Explain in brief the factors affecting investment and production cost. 04
2
(c) What are the various stages of process development of a chemical plant? 07
Q.5 (a) Define depreciation. List methods for determining depreciation. 03
(b) Enlist various methods of Profitability Analysis. Explain any One. 04
(c) Explain the cash flow diagram for an industrial plant. 07
OR
Q.5 (a) Write short note on PERT. 03
(b) Compare PERT & CPM 04
(c) The original value of a piece of equipment is 1,15,00,000 completely installed and
ready for use. Its salvage value is estimated to be 15,00,000 at the end of a service
life estimated to be 15 years. Determine the asset (or book) value of the equipment
at the end of 8 years using straight line, decline balance and Double decline
method.
07

*************