Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 8th Sem New 2180611 Construction Management Previous Question Paper
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER ?VIII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2180611 Date:09/05/2019
Subject Name:Construction Management
Time:10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
MARKS
Q.1 (a) Why Indian construction industry need construction management? 03
(b) What is Bar chart? Explain with example of Bar chart. 04
(c) Draw a job layout of Road construction. 07
Q.2 (a) Define the term 1) Inventory 2) Cost Code 3) revenue 03
(b) Prepare a work breakdown structure for Dam construction 04
(c) From the following network and find out project duration, critical path,
total float and free float.
6 15
8
7
7 10
6
12
07
OR
(c) A) Draw the network from following data also find out critical path,
critical activity, project duration
Sr.No Activity Duration Precedence Successor
1 A 5 --- E
2 B 6 ---- C,D
3 C 4 B F
4 D 9 B G
5 E 8 A I
6 F 10 C H
7 G 5 D -----
8 H 6 F -----
9 I 7 E -----
07
Q.3 (a) Define the term 1) Resource allocation 2) Slack 3) Dummy activity 03
(b) What is value engineering? Explain in detail. 04
(c) What is optimum solution in network analysis? Explain the steps to find an
optimum solution.
07
OR
Q.3 (a) Define the term 1) Project cost 2) Critical path 3) Float 03
(b) What is a time grid diagram explain in detail 04
(c) Write a short note on ? Precedence Network. 07
Q.4 (a) Enumerate and discuss principles of organization. 03
(b) Write down importance of Material Management in Construction Industry 04
(c) Write a short note on Ladder network. 07
FirstRanker.com - FirstRanker's Choice
1
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER ?VIII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2180611 Date:09/05/2019
Subject Name:Construction Management
Time:10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
MARKS
Q.1 (a) Why Indian construction industry need construction management? 03
(b) What is Bar chart? Explain with example of Bar chart. 04
(c) Draw a job layout of Road construction. 07
Q.2 (a) Define the term 1) Inventory 2) Cost Code 3) revenue 03
(b) Prepare a work breakdown structure for Dam construction 04
(c) From the following network and find out project duration, critical path,
total float and free float.
6 15
8
7
7 10
6
12
07
OR
(c) A) Draw the network from following data also find out critical path,
critical activity, project duration
Sr.No Activity Duration Precedence Successor
1 A 5 --- E
2 B 6 ---- C,D
3 C 4 B F
4 D 9 B G
5 E 8 A I
6 F 10 C H
7 G 5 D -----
8 H 6 F -----
9 I 7 E -----
07
Q.3 (a) Define the term 1) Resource allocation 2) Slack 3) Dummy activity 03
(b) What is value engineering? Explain in detail. 04
(c) What is optimum solution in network analysis? Explain the steps to find an
optimum solution.
07
OR
Q.3 (a) Define the term 1) Project cost 2) Critical path 3) Float 03
(b) What is a time grid diagram explain in detail 04
(c) Write a short note on ? Precedence Network. 07
Q.4 (a) Enumerate and discuss principles of organization. 03
(b) Write down importance of Material Management in Construction Industry 04
(c) Write a short note on Ladder network. 07
2
OR
Q.4 (a) Discuss ABC analysis for material management 03
(b) State and describe various causes of accidents at the construction site. 04
(c) Draw the network from following three time estimate, find out total project
duration.
Activity Optimistic time Pessimistic time Most likely time
1-2 2 6 4
1-3 2 10 6
1-4 7 9 6
2-3 4 9 7
3-5 3 12 11
4-5 4 14 10
07
Q.5 (a) List out project performance attributes for success of project 03
(b) Write short note on Updating. 04
(c) Explain the steps to solve linear programming problem by simplex method. 07
OR
Q.5 (a) What is breakeven point? Where it can be used? 03
(b) Differentiate between quality assurance and quality control 04
(c) Write steps to solve linear programming problem by graphical method. 07
*************