Q.1
--- Content provided by FirstRanker.com ---
- (a) What is ‘Project’? [03]
- (b) Explain in brief the important parameters of project. [04]
- (c) How will you decide whether a new project is feasible or not? [07]
OR
- (a) What are the objectives of using network analysis? [03]
- (b) Write brief note on : Social cost benefit analysis of a project. [04]
- (c) Define : (i) SSI (ii) Tiny sector industry (iii) Ancillary industry (iv) Village industry. [07]
--- Content provided by FirstRanker.com ---
Q.2
- (a) What is industrially backward area? Write the advantages and disadvantages of starting an industry in backward area. [03]
- (b) How ‘Milestone Chart’ differs from ‘Gantt Chart’? [04]
- (c) What care one should take for better drawing of network diagrams? [07]
--- Content provided by FirstRanker.com ---
OR
- (a) A project consists of 8 activities A,B,C,D,E,F,G and H with their time of completions as follows: [03]
Activities A B C D E F G H Duration (weeks) 3 5 2 4 7 5 6 4 - A and B can be performed in parallel.
- C and D cannot start until A is complete.
- E cannot start until half the work of activity C is complete.
- F can start only after activity D is complete.
- G succeeds C.
- H is the last activity which should succeed E
--- Content provided by FirstRanker.com ---
- (b) What is difference between an ‘Event’ and an ‘Activity’? [04]
- (c) What is dummy activity and why is it used ? [07]
--- Content provided by FirstRanker.com ---
Q.3
- (a) Consider the data of a software project as shown in table given below. The activities are different modules of the software application, which is to be developed. Construct a network of this software project. [03]
Activities A B C D E F G H I J Immediate Predecessor - A A A D D J E F,G H - (b) What is CPM? State the application of it. [04]
- (c) Distinguish between Total Float and Free Float of an activity. [07]
--- Content provided by FirstRanker.com ---
OR
- (a) Draw the network for the following project and compute the earliest and latest time for each event and also find critical path. [03]
Activity Immediate Predecessor Time 1-2 - 7 1-3 - 6 1-3 - 2-3 1-3 2-4 & 3-4 - 5 4-5 - 8 4-6 - 4 6-7 & 5-7 - 11 - (b) What is PERT? State the application of it. [04]
- (c) What is meant by project direct and project indirect costs ? Explain their importance. [07]
Q.4
--- Content provided by FirstRanker.com ---
- (a) Consider the details of a project which has 10 activities as shown in following table: [03]
Activities A B C D E F G H I J Immediate Predecessor(s) - - - - B E C A,F E D,G Duration in months 6 10 11 9 5 8 12 8 7 4
Q.5
- (a) Discuss in brief the resources allocation problem. [03]
- (b) DIC is considered to be a single window service organization for small entrepreneurs. - Describe in detail [04]
- (c) From the information given below, draw the PERT network : [07]
Activity Optimistic Most Likely Pessimistic 10-20 5 9 17 10-30 4 8 16 20-40 3 7 20 30-40 3 7 15 40-50 3 10 21 20-50 3 7 12 30-50 2 5 9
--- Content provided by FirstRanker.com ---
OR
- (a) What is Updating of a network ? [03]
- (b) What are the components of cost of projects? Discuss them in detail. [04]
- (c) Based on the data given below, determine the optimum duration of the project and the corresponding minimum cost. [07]
Activity Normal Crash Duration (week) Cost (Rs.) Duration (week) Cost (Rs.) 1-2 6 8000 3 15500 1-3 8 5000 5 9500 2-3 4 7000 1 10000 2-4 5 9000 3 16000 3-4 5 6000 3 12000