Download GTU BE/B.Tech 2019 Summer 8th Sem New 2181704 Project Engineering And Management Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 8th Sem New 2181704 Project Engineering And Management Previous Question Paper

1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VIII(NEW) EXAMINATION ? SUMMER 2019
Subject Code:2181704 Date:15/05/2019

Subject Name:Project Engineering and Management

Time:10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.


MARKS

Q.1 (a) Explain importance of project management related to Instrumentation
engineering.
03
(b) Enlist various documents related to project management. 04
(c) Discuss various types of projects and contracts in details. 07

Q.2 (a) What is calibration? Explain calibration process of pressure gauge. 03
(b) Compare EPC and BOOT types of project with example. 04
(c)
Enlist types of level instruments and describe its selection process.
07
OR
(c)
Explain term: Project breakdown structure and planning cycle, project
specification, and various charts related to project management.
07
Q.3 (a)
What are the standards input and supply pressure in Instrumentation system?
Discuss reason to use such standard.
03
(b) What are the various types of S curve? Explain its importance with one
example.
04
(c)
Compare CPM vs PERT technique with types of industry.
07
OR
Q.3 (a)
Explain in brief: estimation of activity time of project.
03
(b)
Define control valve coefficient
04
(c)
Discuss various types of project management functions and explain project
controlling and project planning, scheduling in details.
07
Q.4 (a) Explain importance of wiring and tagging in control panel 03
(b) Enlist various types of flow measurement techniques. 04
(c)
Enlist types of pressure instruments and describe its selection process.
07
OR
Q.4 (a)
What is Loop check? Write check-out procedure for filled system
temperature transmitter.
03
(b)
Classify hazardous locations as per NEC code.
04
(c) Compare pneumatic, electric and hydraulic system with various points. 07
Q.5 (a) Explain concept of dead zero and live zero. 03
(b)
Define startup time. What are problem faced during this time?
04
(c)
Enlist various types of control valve used for slurry application. Write short
note on control valve selection
07
OR

Q.5 (a) Write short note on Bar Chart and its application. 03
(b) Narrate importance of instrument tagging. 04
(c) What are the various types of ISO certification and standards? Discuss
9000 test and calibration standard.
07

************
FirstRanker.com - FirstRanker's Choice

This post was last modified on 20 February 2020