FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2019 Summer 8th Sem Old 180901 Commissioning Of Electrical Equipments Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2019 Summer 8th Sem Old 180901 Commissioning Of Electrical Equipments Previous Question Paper

This post was last modified on 20 February 2020

GTU BE 2019 Summer Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VIII (OLD) EXAMINATION - SUMMER 2019

--- Content provided by‌ FirstRanker.com ---

Subject Code: 180901 Date: 15/05/2019
Subject Name: Commissioning of Electrical Equipments
Time: 10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

Q.1 (a) Define Routine test & Type test. List out the different types of routine test performed on power transformer. [07]
(b) Explain polarity test of 3-phase transformer. [07]

Q.2 (a) Define polarization index number. Which information is available from it? [07]

--- Content provided by​ FirstRanker.com ---

(b) Explain the drying out procedure of static machine. [07]

OR

(b) Explain the mechanical endurance test performed on circuit breaker. [07]

Q.3 (a) List out the different types of test performed on D.C. Machine to know the performance of it. Explain any Swinburne’s test. [07]
(b) Explain the speed control methods of 3-phase induction motor. [07]

--- Content provided by‌ FirstRanker.com ---

OR

Q.3 (a) Explain the High voltage test of power transformer. [07]
(b) Explain the test for measurement of insulation resistance of 3-phase power transformer. [07]

Q.4 (a) Explain Hopkinson’s test of d.c. machine [07]
(b) Explain the temperature rise test of 3-phase induction motor. [07]

--- Content provided by​ FirstRanker.com ---

OR

Q.4 (a) Explain the different methods to measure the earth resistance. [07]
(b) State the conditions of parallel operation of two alternators. Explain the dark lamp method with circuit diagram. [07]

Q.5 (a) Explain different methods of cooling of power transformer. [07]
(b) Explain the Murry-Loop Test for the location of cable fault. [07]

--- Content provided by‌ FirstRanker.com ---

OR

Q.5 (a) Define slip of an induction motor. Explain the different methods to measure the slip of an induction motor. [07]
(b) Define burden-of a CT. Explain how polarity test is carried out on CT? [07]