FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 4th Sem New 2140908 Electrical Power Generation Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 4th Sem New 2140908 Electrical Power Generation Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


Enrolment No.

Subject Code: 2140908

BE - SEMESTER-IV (NEW) EXAMINATION - WINTER 2018

--- Content provided by‍ FirstRanker.com ---

Subject Name: Electrical Power Generation

Time: 02:30 PM TO 05:00 PM

Instructions:

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. --- Content provided by‍ FirstRanker.com ---

  4. Figures to the right indicate full marks.
Q.1 (a) For a steam power station, explain functions of: (i) Air Pre Heater (ii) Cooling Tower (iii) Economizer 03
(b) Explain the essential factors which influence the choice of site for a nuclear power station. 04
(c) Draw and explain neat schematic arrangement of Hydro power station and discuss function of its constituents. 07
Q.2 (a) Write advantages and disadvantages of Steam power station. 03
(b) Differentiate between open cycle gas turbine and closed cycle gas turbine. 04
(c) Draw and explain schematic arrangement of diesel power plant. Give advantages and disadvantages of diesel power plant. 07
Q.2 OR
Determine load factor at which the cost of supplying a unit of electricity from a Diesel and from a Steam station is same if the annual fixed and running charges are as follows :
Diesel Fixed Rs. 300/kW Running Rs. 0.25/kWh
Steam Fixed Rs. 1200/kW Running Rs. 0.0625/kWh
07
Q.3 (a) What are the sources and features of renewable energy sources? 03
(b) Explain the difference between fusion reaction and fission reaction. 04
(c) Define (i) Connected load (ii) Plant capacity factor (iii) Diversity factor (iv) Maximum load (v) Plant use factor (vi) Base load (vii) load curve. 07
Q.3 OR
What is tariff? Discuss three-part tariff. 07
Q.4 (a) Differentiate between Horizontal and Vertical Axis Wind Turbine 03
(b) Explain the need of hybrid systems. Discuss solar-wind hybrid power system with suitable diagram and also state its advantages. 04
(c) Define: (i) solar constant (ii) beam radiation (iii) Diffuse radiation 07
Q.4 OR
(a) Draw and explain the I-V and P-V characteristics of solar photovoltaic cell. 03
(b) Derive equation for maximum power of wind turbine. 04
(c) What is solar radiation spectrum? 07
Q.5 (a) What are the major components of wind energy conversion systems? 03
(b) Explain pyranometer with diagram. 04
(c) Why is neutral earthing necessary in power system? How can it be classified? 07
Q.5 OR
(a) What is resistance grounding? What are its advantages and disadvantages? 03
(b) Write classification of substations. 04
(c) Enlist various equipment’s used in substation
Compare indoor and outdoor substations.

--- Content provided by⁠ FirstRanker.com ---

Explain arc suppression coil earthing in detail.
07

Date: 05/12/2018

Total Marks: 70

FirstRanker.com


--- Content provided by FirstRanker.com ---


This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University