Subject Code: 2171103
GUJARAT TECHNOLOGICAL UNIVERSITY
--- Content provided by FirstRanker.com ---
BE - SEMESTER-VII (NEW) EXAMINATION - WINTER 2018Subject Name: Industrial Automation
Date: 19/11/2018
Time: 10:30 AM TO 01:00 PM
Total Marks: 70
--- Content provided by FirstRanker.com ---
Instructions:
- Attempt all questions.
- Make suitable assumptions wherever necessary.
- Figures to the right indicate full marks.
- Q.1 (a) What is an Industrial Automation? Give Automation’s impact and explain their classification, also. 03
--- Content provided by FirstRanker.com ---
(b) What is robot? & Explain Basic construction and configuration of robots. 04
(c) What do you mean by SCADA system? Explain basic SCADA architecture and typical features. 07 - Q.2 (a) What is a PLC? Draw block diagram of PLC. Explain each block in detail. 03
(b) Explain welding robot and Pick & place robot? 04
(c) Describe the role and elements of computer-aided measurements and control with an example. 07--- Content provided by FirstRanker.com ---
OR
(a) Describe with neat sketches, the construction and working principle of magnetic flow meter. Also discuss its advantages and disadvantages. 07 - Q.3 (a) How pH measurement is done? Explain it in brief. 03
(b) Differentiate Power MOSFET & IGBT. 04
(c) List the different types of speed-measuring devices. Explain, with neat sketches, the construction and working of any two of them. 07--- Content provided by FirstRanker.com ---
OR
(a) What do you mean by IoT ? How it is useful in industrial automation? 03 - Q.4 (b) What do you mean by (i) Smart sensors-(ii)) MODBUS (iii) PROFI-BUS 04
(c) What is sensor & Actuator? List various types of sensor & Explain construction and operation of Resistance thermometer. 07 - Q.5 (a) Write the difference between PLC & DCS? 03
--- Content provided by FirstRanker.com ---
(b) List standard interface & Compare RS232 & RS485 interface. 04
(c) Develop a PLC ladderdiagram for ON-OFF operation of Motor by using
1. START-NO, STOP-NO push buttons.
2. START-NC, STOP-NC push buttons. 07
OR--- Content provided by FirstRanker.com ---
(a) What are general rules to be followed during PLC installation? 03 - Q.4 (b) List the PLC Programming Languages & Draw any four symbols of ladder Diagram. 04
(c) A process fan P is to run only when all of the following conditions are met.
- Input 1 is off.
- Input 2 is on or input 3 is on, or both 2 and 3 are on.--- Content provided by FirstRanker.com ---
- Inputs 5 and 6 both are off.
- One or more of inputs 7, 8 or 9 is on.
Obtain PLC Ladder Logic diagram for this problem. 07 - Q.5 (a) Explain Scan cycle of PLC? 03
(b) Why isolation is required in I/O Bus? Explain I/O Bus isolation using opto-coupler. 04--- Content provided by FirstRanker.com ---
(c) Write short note on AC & DC drive. 07
OR
(b) Discuss about the various types of displays that can be achieved using DCS for efficient monitoring of plant parameters. 04
(c) What do you mean by data highway? Explain role of fiber optic in data highway design and advantages of using fiber optic over twisted pair and coaxial cable. 07
--- Content provided by FirstRanker.com ---
This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University