Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VII (NEW) EXAMINATION ? WINTER 2018
Subject Code: 2171501 Date: 15/11/2018

Subject Name: Operations Planning & Control

Time: 10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

MARKS

Q.1 (a) What is Process planning? 03
(b) Explain Index method of scheduling. 04
(c)
What are the conditions under which you apply Johnson?s rule for finding Optimal
Sequence of operations?
07

Q.2 (a) What is scheduling? 03
(b) Discuss Economic Manufacturing Quantity. 04
(c) Discuss Production planning v/s Project planning. 07
OR
(c) Discuss MRP and its four fundamental inputs. 07
Q.3 (a) Discuss a composite production system. 03
(b) Short note on: Line of balance technique. 04
(c) The sequence of manufacturing a product is as follows; Find out minimum
no. of work stations and line efficiency:

Operation A B C D E F G H
Time
(In Min.)
3 7 8 4 2 5 23 8

07
OR
Q.3 (a) Explain scope of scheduling with example. 03
(b) Explain method of regression analysis. 04
(c) Discuss aggregate planning. Justify use of mixed strategy. 07
Q.4 (a) Classify sales forecasting techniques. 03
(b) Discuss Master Production Scheduling. 04
(c) Discuss how PPC function is carried out in Job Production, Batch
Production and Continuous production.
07

OR

Q.4 (a) What is ?Break even analysis?? 03
(b) Discuss usefulness and limitations of ?Break even analysis? 04
(c) Use Johnson?s rule to find out the best sequence and find total idle time
form the following data :

Job

1 2 3 4 5 6
Milling M/c

1 5 4 2 2 4
Drilling M/c

3 1 5 2 7 3


07
Q.5 (a) What is dispatching? 03
(b) Explain the procedure of decentralizing dispatching system. 04
(c) Discuss Route sheet preparation with an example. 07
OR

www.FirstRanker.com www.FirstRanker.com
www.FirstRanker.com
FirstRanker.com - FirstRanker's Choice
www.FirstRanker.com
1
Seat No.: ________ Enrolment No.___________

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER ?VII (NEW) EXAMINATION ? WINTER 2018
Subject Code: 2171501 Date: 15/11/2018

Subject Name: Operations Planning & Control

Time: 10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

1. Attempt all questions.

2. Make suitable assumptions wherever necessary.

3. Figures to the right indicate full marks.

MARKS

Q.1 (a) What is Process planning? 03
(b) Explain Index method of scheduling. 04
(c)
What are the conditions under which you apply Johnson?s rule for finding Optimal
Sequence of operations?
07

Q.2 (a) What is scheduling? 03
(b) Discuss Economic Manufacturing Quantity. 04
(c) Discuss Production planning v/s Project planning. 07
OR
(c) Discuss MRP and its four fundamental inputs. 07
Q.3 (a) Discuss a composite production system. 03
(b) Short note on: Line of balance technique. 04
(c) The sequence of manufacturing a product is as follows; Find out minimum
no. of work stations and line efficiency:

Operation A B C D E F G H
Time
(In Min.)
3 7 8 4 2 5 23 8

07
OR
Q.3 (a) Explain scope of scheduling with example. 03
(b) Explain method of regression analysis. 04
(c) Discuss aggregate planning. Justify use of mixed strategy. 07
Q.4 (a) Classify sales forecasting techniques. 03
(b) Discuss Master Production Scheduling. 04
(c) Discuss how PPC function is carried out in Job Production, Batch
Production and Continuous production.
07

OR

Q.4 (a) What is ?Break even analysis?? 03
(b) Discuss usefulness and limitations of ?Break even analysis? 04
(c) Use Johnson?s rule to find out the best sequence and find total idle time
form the following data :

Job

1 2 3 4 5 6
Milling M/c

1 5 4 2 2 4
Drilling M/c

3 1 5 2 7 3


07
Q.5 (a) What is dispatching? 03
(b) Explain the procedure of decentralizing dispatching system. 04
(c) Discuss Route sheet preparation with an example. 07
OR

www.FirstRanker.com www.FirstRanker.com
www.FirstRanker.com
www.FirstRanker.com
2
Q.5 (a) What are different types of production? 03
(b) Discuss forecasting for a new product being launched, with an example. 04
(c) Define OPC function in an organization. Discuss different phases of PPC. 07

*************