FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 7th Sem New 2171504 Industrial Statistics And Quality Management Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 7th Sem New 2171504 Industrial Statistics And Quality Management Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER-VII (NEW) EXAMINATION - WINTER 2018

--- Content provided by‌ FirstRanker.com ---

Subject Code: 2171504 Date: 29/11/2018
Subject Name: Industrial Statistics & Quality Management
Time: 10:30 AM TO 01:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‌ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.

MARKS

Q.1 (a) Define “Quality” from different perspective. 03
(b) Define statistics. Differentiate between statistics as data and statistics as 04 method.

--- Content provided by‍ FirstRanker.com ---

(c) What do you mean by quality control ? State difference between inspection and quality control. Also explain “cost of quality”. 07

Q.2 (a) Define probability and explain its importance in SQC. 03
(b) Explain the following terms : 04
(1) Quality assurance (ii) Quality management
(c) “A true total quality environment can have only one focus : Customer satisfaction”. — Explain. 07

--- Content provided by​ FirstRanker.com ---

OR

(c) Critically examine the statement : “Statistics can prove anything”. 07

Q.3 (a) Distinguish between Histogram and Ogive. 03
(b) State various kinds of distribution and explain the important characteristics of any one of them. 04
(c) A day’s production schedule calls for 8000 items. Three machines each with a daily production capacity of 3000 are available and the probability that an item is defective is 1, 2, & 4 percent for machines A, B, & C respectively. On a given day 3000 items were produced on machine A, 3000 on machine B and 2000 on machine C.

--- Content provided by‍ FirstRanker.com ---

One item is selected at random and found defective. What is the probability that this item was produced on machine A ? 07

OR

Q.3 (a) What do you understand by skewness and kurtosis ? 03
(b) Explain in short about Baye’s theorem. 04
(c) In a partially destroyed laboratory record of an analysis of correlation data, the following results are only legible : 07

--- Content provided by⁠ FirstRanker.com ---

Variance of X =9
Regression equations : 4X —5Y +33=0
20X -9Y-107=0
Find : (1) the mean value of X and Y
(ii) the standard deviation of Y, and

--- Content provided by‌ FirstRanker.com ---

(iii) the correlation coefficient

Q.4 (a) State the benefits from quality assurance on reliability. 03
(b) What is the meaning of (i) Process natural tolerance and (ii) Assignable causes ? 04
(c) The following are the sample means and ranges for 10 samples each of size 5. 07
Calculate the control limits for mean chart and range chart and state whether the process is in control or not.

--- Content provided by FirstRanker.com ---

Sample No. Mean Range Sample No. Mean Range
1 4.94 0.3 6 5.10 0.1
2 4.92 0.4 7 4.98 0.8
3 4.92 0.2 8 5.02 0.5
4 4.92 0.4 9 4.96 0.3
5 4.98 0.1 10 5.04 0.5

(Take A2 =0.577, D3 =0, D4 = 2.115 for sample size of 5)

OR

Q.4 (a) What do you understand by TQM? 03
(b) Explain the main reasons for variations. 04
(c) During an examination of equal length of cloth, the following are the no. of defects observed : 07

--- Content provided by​ FirstRanker.com ---

3,2,1,0,4,5,3,7,2,4,1
Draw suitable control chart and comment whether the process is under control or not ?

Q.5 (a) What is process capability ? 03
(b) What information does the O.C. curve provide ? 04
(c) Explain the sampling plan which requires less amount of inspection for given values of consumer’s risk and producer’s risk. 07

--- Content provided by⁠ FirstRanker.com ---

OR

Q.5 (a) List the basic elements of a process capability analysis. 03
(b) What are the two important characteristics a good acceptance sampling plan should have ? 04
(c) Write note on Six sigma concept. 07