FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 7th Sem New 2171901 Operation Research Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 7th Sem New 2171901 Operation Research Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

Subject Code: 2171901

FirstRanker.com

--- Content provided by FirstRanker.com ---

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER-VII (NEW) EXAMINATION - WINTER 2018

Subject Name: Operation Research

Time: 10:30 AM TO 01:00 PM

Instructions:

--- Content provided by​ FirstRanker.com ---

  1. Attempt all questions.
  2. Make suitable assumptions wherever necessary.
  3. Figures to the right indicate full marks.

Q1 (a) Illustrate graphically for Linear Programming Problem; (a) No-feasible solution (b) Unbounded solution. 03

(b) A firm plans to purchase atleast 200 quintals of scrap containing high quality metal X and low quality metal Y. It decides that the scrap to be purchased must contain atleast 100 quintals of X-metal and not more than 35 quintals of Y-metal. The firm can purchase the scrap from two suppliers (A and B) in unlimited quantities. The percentage of X and Y metals in terms of weight in the scraps supplied by A and B is given below: 04

--- Content provided by‍ FirstRanker.com ---

Metals Suppliers A Suppliers B
X 25% 75%
Y 10% 20%

(c) The price of supplier A’s scrap is Rs. 200 per quintal and that of supplier B’s is Rs. 400 per quintal. Formulate this problem as LP model to minimize total purchase cost. 07

Q2 (a) Solve by Simplex method the following L.P. problem 03

Minimize Z = 500 x; + 200 x,

Subjected to the constraints,

3 X, + 2 X, £ 90

--- Content provided by FirstRanker.com ---

x1.=> 10

Xy = 2 X1

X1,X; = 0

(b) Discuss in brief the areas of application of Operation Research. 04

(c) Find the dual problem for the following: 07

--- Content provided by‌ FirstRanker.com ---

Minimize Z = 5x; — 6x, + 4x3

Subject to-the constraints,

3X1 + 4XZ + 6X3 >9

X1+3XZ+2.X3 >5

7x1 - ZXZ —x3 < 10

--- Content provided by⁠ FirstRanker.com ---

X, —2x, +4x; >4

2x1 + SXZ - 3X3 =3

X1,%X9,%3 =0

The data for a network is given below.

Activity Time in days Direct cost (Rs.)
Normal Crash Normal Crash
1-2 10 4 2300 3100
1-3 12 3 1700 2600
2-4 20 10 2400 4400
3-5 10 9 1100 1500
4-5 6 6 800 800

Date: 26/11/2018 Total Marks: 70

--- Content provided by⁠ FirstRanker.com ---

FirstRanker.com

(1) Find the normal duration of project completion and corresponding cost.

(i) What can be minimum compression of project and corresponding total time?

(i11) Find the optimal duration of project completion and related cost.

OR

--- Content provided by FirstRanker.com ---

(¢) A construction company is preparing a PERT network for laying the foundation of a new art museum. Given the following set of activities, their predecessor requirements and three time estimates of completion time: 07

Activities Predecessors Optimistic Pessimistic Most Likely
A None 2 4 3
B None 8 8 8
C A 7 11 9
D B 6 6 6
E C 9 11 10
F C 10 18 14
G C,D 11 11 11
H F,G 6 14 10
I E 4 6 5
J I 3 5 4
K H 1 1 1

(a) Draw the PERT network.

(b) What is the expected time of the duration of the project?

(c) What is the probability that the project will be completed in 40 weeks?

Use the following data :

--- Content provided by​ FirstRanker.com ---

Z 1.0 1.22 1.57 1.87

Probability 0.8413 0.8888 0.9418 0.9693

Q.3 (a) Define the following terms: balking, reneging and jockeying. 03

(b) Explain in brief characteristicof queuing theory. What is traffic intensity? If traffic intensity of a systenis given to be 0.76, what percent of time the system would be idle? 04

(¢) The following is the pay-off matrix between player X and player Y. Find the optimal strategies, their frequencies and the value of the game. Use rule of dominance and.oddment in calculations. 07

--- Content provided by FirstRanker.com ---

Player Y
A B C D
Player X I 0.25 0.20 0.14 0.30
I 0.27 0.16 0.12 0.14
11 0.35 0.08 0.15 0.19
v -0.02 0.08 0.13 0.00

OR

Q.3 (a) What do you understand by ‘zero-sum’ in the context of game theory? Explain the meaning following terms used in game theory; 07

  1. Saddle Point
  2. Pure Strategy
  3. Mixed Strategy
  4. --- Content provided by‍ FirstRanker.com ---

FirstRanker.com

Q4 (a) A telephone exchange has two operators to handle 3cqigingFirsRRATRer.cofl?

distribution, with an average time of 9 minutes between consecutive arrivals. The length of telephone call is exponentially distributed with a man of 3 minutes. Find: 03

i. Determine the probability that a person arriving at the booth will have to wait.

ii. Find the average queue length that forms from time to time.

--- Content provided by FirstRanker.com ---

iii. The telephone company will install a second booth when conveniences that an arrival would expect to have to wait at least four minutes for the phone. Find the increase in flow of arrivals, which will justify a second booth.

iv. What is the probability that an arrival will have to wait for more than 10 minutes before the phone is free?

v. Find the fraction of a day that the phone will be in use.

(b) Explain the meaning of following items in inventory management; 04

a. Re-order Level

--- Content provided by FirstRanker.com ---

b. Buffer Stock

(c) Discuss the similarity and differences between PERT and CPM. 07

Q4 (a) A stockiest of a particular commodity makes a profit of Rs. 30 on each sale made within the same week of purchase; otherwise he incurs a loss of Rs. 30 on each item. The data on the past sales are given below: 07

No. of items sold within the same week 3 6 7 8 9 10 1
Frequency 0 9 12 1241 9 6 0

1. Find out the optimum number of items the stockiest should buy every week in order to maximize the profit.

ii. Calculate the expected value of perfect information.

--- Content provided by FirstRanker.com ---

OR

(b) Explain ABC analysis. 07

Q5 (@ The truck-owner finds from his past.experience that the maintenance costs are Rs. 200 for the first year and then increase by Rs. 2000 every year. The cost of truck type A is Rs. 9000: Determine the best age at which to replace the truck. If the optimum replacement is followed what will be the average yearly cost of owning and operating the truck? Truck of type B costs Rs. 20000. Annual operating costs are Rs. 400 for the first year and then increase by Rs. 800 every, year. The truck owner has now the truck type A which is one year old. Should it be replaced by B type truck, and if so when? 06

(b) A hardware store procures and sells hardware items. Information on an item is given here: 08

Expected annual sales = 8000 units

--- Content provided by‌ FirstRanker.com ---

Ordering cost = Rs. 180 per order

Holding cost = 10% of the average inventory value

The item can be purchased according to the following schedule:

Lot size Unit price (Rs.)
1-999 22
1000-1499 20
1500-1999 19
2000 and above 18.5

Determine the best order size.

FirstRanker.com

--- Content provided by FirstRanker.com ---

approximation method to find out initial feasible solution.

Market (Per unit profit in Rs.) Availability in warehouses
Warehouse A B C D Demand in the markets
X 12 18 6 25 X =200 units A =180 units
Y 8 7 10 18 Y =500 units B = 320 units
Z 14 3 11 20 Z =300 units C =100 units D =400 units

OR

Q.5 (a) What is degeneracy in transportation problems? Explain how to resolve degeneracy in a transportation problem. 06

(b) You are given the information about the cost of performing different jobs by different persons. The job person making ‘X’ indicates that the individual involved cannot perform the particular job. Using this information, state (i) the optimal assignment of job. (ii) the cost of such assignment. 08

J1 J2 J3 J4 J5
P1 27 18 X 20 21
P2 31 24 21 12 17
Ps3 20 17 20 X 16
P4 22 28 20 16 27

--- Content provided by FirstRanker.com ---