FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download GTU BE/B.Tech 2018 Winter 8th Sem New 2182907 Process And Quality Control In Spinning Question Paper

Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2018 Winter 8th Sem New 2182907 Process And Quality Control In Spinning Previous Question Paper

This post was last modified on 20 February 2020

GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University


FirstRanker.com

GUJARAT TECHNOLOGICAL UNIVERSITY

BE - SEMESTER-VIII (NEW) EXAMINATION — WINTER 2018

--- Content provided by‍ FirstRanker.com ---

Subject Code: 2182907 Date: 19/11/2018

Subject Name: Process & Quality Control in Spinning

Time: 02:30 PM TO 05:00 PM Total Marks: 70

Instructions:

  1. Attempt all questions.
  2. --- Content provided by‍ FirstRanker.com ---

  3. Make suitable assumptions wherever necessary.
  4. Figures to the right indicate full marks.
MARKS
Q.1
(A) Enlist Parameters Contributing Cleaning Efficiency In Blow Room 3
(B) Explain The Effect Of Quality Of Drafting On Yarn Strength. 4
(C) State The Avoidable Causes Of Loss In Efficiency At Ring Frame And Suggest Remedial Measures For Each Of Them. 7
Q.2
(A) State The Methods To Measure Fractionating Efficiency Of A Comber. 3
(B) Discuss Implementation Of The Machinery Audit. 4
(C) Describe Determination Of Trash Content And Cleaning Efficiency For Blow Room. 7
OR
(C) How Machinery Audit Is Different Than Routine Maintains. Explain With Neat Diagram Any One Instrument Used For Machinery Audit. 7
Q.3
(A) What Is The Importance Of Process Control In Spinning 3
(B) Explain In Brief Modern Process Control In Spinning. 4
(C) Describe Performance Assessment Of Comber. 7
OR
Q.3
(A) What Is Yarn Realisation, Enlist Parameters Affecting It. 3
(B) Write Brief Note On Bale Management In Spinning. 4
(C) Explain AFIS And Discuss Its Advantages. 7
Q.4
(A) How Can Soft Waste Be Controlled? 3
(B) Explain Briefly The Concept Of Hypothetical Mill. 4
(C) Explain Waste Control At Card. Also Discuss How To Optimised It. 7
OR
Q.4
(A) Enlist Steps To Improve Any One Machine Productivity 3
(B) How Can Yarn Appearance Be Measured? 4
(C) Discuss The Role Of Speed Frame With Reference To Between Bobbin Count Variation. 7
Q.5
(A) What Is Classimate Faults 3
(B) Blow Room And Carding Do Not Affect Within Bobbin Count Variation’ . Justify The Statement. 4
(C) Discuss Remedial Measures For Controlling Loss In Efficiency Due To Following Causes In Ring Frame Department Of A Spinning Mill : (I) Waiting For Doffing (Ii) Waiting For Empty Bobbins (Iii) Idle Spindles 7
OR
Q.5
(A) Enlist Parameters That Prevent Yarn Hairiness 3
(B) Discuss Random Component Of Yarn Irregularity In Detail. 4
(C) Discuss Various Factors Affecting Yarn Strength. 7

FirstRanker.com


--- Content provided by‌ FirstRanker.com ---


This download link is referred from the post: GTU BE/B.Tech 2018 Winter Question Papers || Gujarat Technological University