Download GTU (Gujarat Technological University) BE/BTech (Bachelor of Engineering / Bachelor of Technology) 2017 Winter 7th Sem Old 170503 Plant Design And Project Engineering Previous Question Paper
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER VII(OLD) ? EXAMINATION ? WINTER 2017
Subject Code: 170503 Date: 10/11 /2017
Subject Name: Plant Design and Project Engineering
Time: 10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1 Answer the following: 07
1 Explain the role of a cost engineer. 1
2 Explain six tenths factor rule. 1
3 What is ?capitalized engineering?? 1
4 What are scale models? 1
5 What is salvage value? 1
6 What is a preliminary or quick estimate design? 1
7 Explain ?pyrolysis? as a solid waste disposal option. 1
(b) Discuss the factors to be considered for ideally locating a fertilizer industry in
Gujarat.
07
Q.2 (a) Sketch plant layout of any (Chemical) industry that you have visited. As a
chemical engineer, justify the same.
07
(b) Discuss in detail design information from literature. 07
OR
(b) Discuss types of flow diagrams in detail. 07
Q.3 (a) Discuss community factors and their significance in plant location 07
(b) Discuss selection criteria of size reduction equipments 07
OR
Q.3 (a) Write the specification sheet for a heat exchanger. 07
(b) Discuss noise pollution and control in industry. 07
Q.4 (a) Discuss causes of depreciation. Explain in brief (i) Straight-line method and (ii)
Sinking Fund method for calculating depreciation.
07
(b) What is optimum design? Explain ?breakeven chart? for production schedule
and its significance for optimum analysis.
07
OR
Q.4 (a) List cost indices. Discuss any two in detail. 07
(b) What is single unit and group depreciation? Evaluate depreciation methods. 07
Q.5 (a) What is replacement? Discuss profitability evaluation for the same. 07
(b) What is a pilot plant? Discuss the subsequent development stages of semi-
commercial/commercial production
07
OR
Q.5 (a) Compare and contrast PERT and CPM Project management techniques. 07
(b) 1. In comparison of different processes, explain (i)?Technical factors? and
(ii)? Time factor?
07
*************
FirstRanker.com - FirstRanker's Choice
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER VII(OLD) ? EXAMINATION ? WINTER 2017
Subject Code: 170503 Date: 10/11 /2017
Subject Name: Plant Design and Project Engineering
Time: 10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1 Answer the following: 07
1 Explain the role of a cost engineer. 1
2 Explain six tenths factor rule. 1
3 What is ?capitalized engineering?? 1
4 What are scale models? 1
5 What is salvage value? 1
6 What is a preliminary or quick estimate design? 1
7 Explain ?pyrolysis? as a solid waste disposal option. 1
(b) Discuss the factors to be considered for ideally locating a fertilizer industry in
Gujarat.
07
Q.2 (a) Sketch plant layout of any (Chemical) industry that you have visited. As a
chemical engineer, justify the same.
07
(b) Discuss in detail design information from literature. 07
OR
(b) Discuss types of flow diagrams in detail. 07
Q.3 (a) Discuss community factors and their significance in plant location 07
(b) Discuss selection criteria of size reduction equipments 07
OR
Q.3 (a) Write the specification sheet for a heat exchanger. 07
(b) Discuss noise pollution and control in industry. 07
Q.4 (a) Discuss causes of depreciation. Explain in brief (i) Straight-line method and (ii)
Sinking Fund method for calculating depreciation.
07
(b) What is optimum design? Explain ?breakeven chart? for production schedule
and its significance for optimum analysis.
07
OR
Q.4 (a) List cost indices. Discuss any two in detail. 07
(b) What is single unit and group depreciation? Evaluate depreciation methods. 07
Q.5 (a) What is replacement? Discuss profitability evaluation for the same. 07
(b) What is a pilot plant? Discuss the subsequent development stages of semi-
commercial/commercial production
07
OR
Q.5 (a) Compare and contrast PERT and CPM Project management techniques. 07
(b) 1. In comparison of different processes, explain (i)?Technical factors? and
(ii)? Time factor?
07
*************
Marking Scheme
Q Description Marks
Q.1 (a) Answer the following: 07
1 Explain the role of a cost engineer. 1
2 Explain six tenths factor rule. 1
3 What is ?capitalized engineering?? 1
4 What are scale models? 1
5 What is salvage value? 1
6 What is a preliminary or quick estimate design? 1
7 Explain ?pyrolysis? as a solid waste disposal option. 1
(b) Discuss the factors to be considered for ideally locating a fertilizer
industry in Gujarat.
07
Q.2 (a) Sketch plant layout of any (Chemical) industry that you have visited. As a
chemical engineer, justify the same.
02+05
(b) Discuss in detail design information from literature. 07
OR
(b) Discuss types of flow diagrams in detail. 07
Q.3 (a) Discuss community factors and their significance in plant location 04+03
(b) Discuss selection criteria of size reduction equipments 07
OR
Q.3 (a) Write the specification sheet for a heat exchanger. 07
(b) Discuss noise pollution and control in industry. 03+04
Q.4 (a) Discuss causes of depreciation. Explain in brief (i) Straight-line method
and (ii) Sinking Fund method for calculating depreciation.
03+02+02
(b) What is optimum design? Explain ?breakeven chart? for production
schedule and its significance for optimum analysis.
02+03+02
OR
Q.4 (a) List cost indices. Discuss any two in detail. 03+04
(b) What is single unit and group depreciation? Evaluate depreciation
methods.
04+03
Q.5 (a) What is replacement? Discuss profitability evaluation for the same. 03+04
(b) What is a pilot plant? Discuss the subsequent development stages of semi-
commercial/commercial production
02+05
OR
Q.5 (a) Compare and contrast PERT and CPM Project management techniques. 07
(b) 2. In comparison of different processes, explain (i)?Technical factors? and
(ii)? Time factor?
04+03
++++++++++++++++
FirstRanker.com - FirstRanker's Choice
Seat No.: ________ Enrolment No.___________
GUJARAT TECHNOLOGICAL UNIVERSITY
BE - SEMESTER VII(OLD) ? EXAMINATION ? WINTER 2017
Subject Code: 170503 Date: 10/11 /2017
Subject Name: Plant Design and Project Engineering
Time: 10:30 AM TO 01:00 PM Total Marks: 70
Instructions:
1. Attempt all questions.
2. Make suitable assumptions wherever necessary.
3. Figures to the right indicate full marks.
Q.1 Answer the following: 07
1 Explain the role of a cost engineer. 1
2 Explain six tenths factor rule. 1
3 What is ?capitalized engineering?? 1
4 What are scale models? 1
5 What is salvage value? 1
6 What is a preliminary or quick estimate design? 1
7 Explain ?pyrolysis? as a solid waste disposal option. 1
(b) Discuss the factors to be considered for ideally locating a fertilizer industry in
Gujarat.
07
Q.2 (a) Sketch plant layout of any (Chemical) industry that you have visited. As a
chemical engineer, justify the same.
07
(b) Discuss in detail design information from literature. 07
OR
(b) Discuss types of flow diagrams in detail. 07
Q.3 (a) Discuss community factors and their significance in plant location 07
(b) Discuss selection criteria of size reduction equipments 07
OR
Q.3 (a) Write the specification sheet for a heat exchanger. 07
(b) Discuss noise pollution and control in industry. 07
Q.4 (a) Discuss causes of depreciation. Explain in brief (i) Straight-line method and (ii)
Sinking Fund method for calculating depreciation.
07
(b) What is optimum design? Explain ?breakeven chart? for production schedule
and its significance for optimum analysis.
07
OR
Q.4 (a) List cost indices. Discuss any two in detail. 07
(b) What is single unit and group depreciation? Evaluate depreciation methods. 07
Q.5 (a) What is replacement? Discuss profitability evaluation for the same. 07
(b) What is a pilot plant? Discuss the subsequent development stages of semi-
commercial/commercial production
07
OR
Q.5 (a) Compare and contrast PERT and CPM Project management techniques. 07
(b) 1. In comparison of different processes, explain (i)?Technical factors? and
(ii)? Time factor?
07
*************
Marking Scheme
Q Description Marks
Q.1 (a) Answer the following: 07
1 Explain the role of a cost engineer. 1
2 Explain six tenths factor rule. 1
3 What is ?capitalized engineering?? 1
4 What are scale models? 1
5 What is salvage value? 1
6 What is a preliminary or quick estimate design? 1
7 Explain ?pyrolysis? as a solid waste disposal option. 1
(b) Discuss the factors to be considered for ideally locating a fertilizer
industry in Gujarat.
07
Q.2 (a) Sketch plant layout of any (Chemical) industry that you have visited. As a
chemical engineer, justify the same.
02+05
(b) Discuss in detail design information from literature. 07
OR
(b) Discuss types of flow diagrams in detail. 07
Q.3 (a) Discuss community factors and their significance in plant location 04+03
(b) Discuss selection criteria of size reduction equipments 07
OR
Q.3 (a) Write the specification sheet for a heat exchanger. 07
(b) Discuss noise pollution and control in industry. 03+04
Q.4 (a) Discuss causes of depreciation. Explain in brief (i) Straight-line method
and (ii) Sinking Fund method for calculating depreciation.
03+02+02
(b) What is optimum design? Explain ?breakeven chart? for production
schedule and its significance for optimum analysis.
02+03+02
OR
Q.4 (a) List cost indices. Discuss any two in detail. 03+04
(b) What is single unit and group depreciation? Evaluate depreciation
methods.
04+03
Q.5 (a) What is replacement? Discuss profitability evaluation for the same. 03+04
(b) What is a pilot plant? Discuss the subsequent development stages of semi-
commercial/commercial production
02+05
OR
Q.5 (a) Compare and contrast PERT and CPM Project management techniques. 07
(b) 2. In comparison of different processes, explain (i)?Technical factors? and
(ii)? Time factor?
04+03
++++++++++++++++