Download PTU B.Tech 2020 March Civil 7th and 8th Sem BTCE 820 Bridge Engineering Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) ) BE/BTech Civil Engineering (CE) 2020 March 7th and 8th Sem BTCE 820 Bridge Engineering Previous Question Paper

This post was last modified on 21 March 2020

PTU B.Tech Question Papers 2020 March (All Branches)


FirstRanker.com

Roll No. [T | Total No. of Pages : 03
Total No. of Questions : 09

--- Content provided by FirstRanker.com ---

B.Tech.(CE) (2012 to 2017) (Sem.-7,8)
BRIDGE ENGINEERING
Subject Code : BTCE-820
M.Code : 71879
Time : 3 Hrs. Max. Marks : 60

--- Content provided by FirstRanker.com ---

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

--- Content provided by​ FirstRanker.com ---

  1. Write briefly :
    1. Why is bridge inspection important?
    2. What are the four types of maintenance system adopted for highway bridges?
    3. What are free and tilted bearings?
    4. Describe the general principle of design of masonry arch bridge.
    5. Draw sketches of cantilever and suspension bridges.
    6. --- Content provided by‌ FirstRanker.com ---

    7. Discuss the precautions to be observed for grouting of ducts in prestressed concrete girders.
    8. Discuss the various types of abutments.
    9. What are the advantages of a circular well?
    10. Define Scour Depth.
    11. Write short note on horizontal and vertical clearance required for highways.
    12. --- Content provided by⁠ FirstRanker.com ---

FirstRanker.com

SECTION-B

  1. What is the need of investigation for bridges & how the selection of bridge site is done?
  2. Determine the design discharge at a bridge side after computing the maximum discharge by :
    1. Empirical method
    2. --- Content provided by⁠ FirstRanker.com ---

    3. Rational method, for the following data :
      Catchment area = 160 km2
      Distance of site from coast = 12 Km
      Distance of critical point to bridge site = 16 Km
      Difference in elevation between the critical point and bridge site = 96 m

      --- Content provided by⁠ FirstRanker.com ---

      Peak intensity of rainfall = 60 mm/h
      Surface of catchment is loam, largely cultivated.
      Cross sectional area of stream at MFE at bridge site = 120 m2
      Wetted perimeter of stream at MFE at bridge site = 90 m
      Stream condition- Clean straight banks, Fair condition.

      --- Content provided by​ FirstRanker.com ---

      Slope of stream = 1/500
  3. State how the water way of a culvert is worked.
  4. List the loads to be considered in the design of plate girder bridges.
  5. What are the requirements of an ideal bearing & discuss neoprene bridge bearing?
  6. --- Content provided by FirstRanker.com ---

FirstRanker.com

SECTION-C

  1. Design RCC Tee beam to suit following data :
    Clear width of roadway = 7.5 m
    Span (centre to centre of bearing) = 16 m

    --- Content provided by⁠ FirstRanker.com ---

    L.L = IRC class AA tracked veh.
    Average thickness of wearing coat = 80 mm
    Concrete mix = M-25 grade
    Steel = Fe 415 grade HYSD bars.
    Compute the design moments and shears and design the deck slab main girders and cross girders and sketch the typical details of reinforcement.
  2. --- Content provided by​ FirstRanker.com ---

  3. Design a suitable masonry abutment for girder bridge. The angle of internal friction of the retained material is 45°. An approach reinforced concrete slab is provided to the bridge so that the effect of surcharge may be neglected. The angle of friction between soil and masonry is 30°. Height of the abutment below road level is 6.0 m. The positive earth pressure in front of the abutment is to be neglected. Density of masonry is 2 t/m3, density of concrete is 2.4 t/m3 & density of soil is 1/8 t/m3.
    1. Why is corrosion prevention important in maintenance of prestressed concrete bridges?
    2. List the equipment needed for bridge inspection.

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.