FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B.Tech 2020 March CSE-IT 7th and 8th Sem BTCS 907 Software Project Management Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) ) BE/BTech CSE/IT (Computer Science And Engineering/ Information Technology) 2020 March 7th and 8th Sem BTCS 907 Software Project Management Previous Question Paper

This post was last modified on 21 March 2020

PTU B.Tech Question Papers 2020 March (All Branches)


FirstRanker.com

Roll No. Total No. of Pages : 02
Total No. of Questions : 18

--- Content provided by FirstRanker.com ---

B.Tech.(CSE) (2012 to 2017 E-ll) (Sem.-7,8)
SOFTWARE PROJECT MANAGEMENT
Subject Code : BTCS-907
M.Code : 71899
Time : 3 Hrs. Max. Marks : 60

--- Content provided by⁠ FirstRanker.com ---

INSTRUCTION TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

--- Content provided by FirstRanker.com ---

Write briefly :

  1. Write any one software process model.
  2. Define COCOMO2 model.
  3. What is meant by cost flow forecasting?
  4. Define monte carlo simulation.
  5. --- Content provided by FirstRanker.com ---

  6. What is Project Sequencing?
  7. What is software Quality Assurance Plan?
  8. Discuss significance of Network planning.
  9. Discuss Hackman & Oldham’s Job Characteristics Model.
  10. What are the benefits of test automation?
  11. --- Content provided by FirstRanker.com ---

  12. Write a short note on Software Reliability.

FirstRanker.com

SECTION-B

  1. What are the steps in cost-benefit analysis? Discuss the cost-benefit evaluation techniques.
  2. Define following :
    1. Types of Risk Management
    2. --- Content provided by⁠ FirstRanker.com ---

    3. Schedule compression
  3. Illustrate the PERT method for identifying the critical path of project.
  4. Distinguish between CMMI and ISO models.
  5. What are the criteria for selecting the right person for the Job?
  6. --- Content provided by‌ FirstRanker.com ---

SECTION-C

  1. Write in detail the monitoring and control of software project management cycle.
  2. Discuss common aspects of Contract Management. What are the types of Contracts and its stages?
  3. Explain different approaches for Project Management. Give the overview of any one tool for Project Management.

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.

--- Content provided by⁠ FirstRanker.com ---

FirstRanker.com



This download link is referred from the post: PTU B.Tech Question Papers 2020 March (All Branches)

--- Content provided by⁠ FirstRanker.com ---