FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download PTU B.Tech 2020 March CSE-IT 7th and 8th Sem BTIT 702 Software Project Management Question Paper

Download PTU (I.K. Gujral Punjab Technical University Jalandhar (IKGPTU) ) BE/BTech CSE/IT (Computer Science And Engineering/ Information Technology) 2020 March 7th and 8th Sem BTIT 702 Software Project Management Previous Question Paper

This post was last modified on 21 March 2020

PTU B.Tech Question Papers 2020 March (All Branches)


FirstRanker.com

Roll No. [ [ ] | [ [ ]] Total No. of Pages : 02

Total No. of Questions : 09

--- Content provided by‍ FirstRanker.com ---

B.Tech.(IT) (2012 to 2017) (Sem.-7)

SOFTWARE PROJECT MANAGEMENT

Subject Code : BTIT-702

M.Code : 71980

Time : 3 Hrs. Max. Marks : 60

--- Content provided by‌ FirstRanker.com ---

INSTRUCTIONS TO CANDIDATES :

  1. SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
  2. SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
  3. SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.

SECTION-A

--- Content provided by‍ FirstRanker.com ---

  1. Answer briefly :
    1. Software Risk
    2. Project Characteristics
    3. CMMI
    4. Project Stakeholders
    5. Strategic planning in Software Project Management
    6. --- Content provided by‌ FirstRanker.com ---

    7. Contract Management
    8. Project Breakdown Structure
    9. Test Automation
    10. ISO/IEC 12207
    11. Change control
    12. --- Content provided by FirstRanker.com ---

SECTION-B

  1. What are the various factors considered for organizing software team? How do the Project manager assign task to individuals?
  2. What is the role of stress, health and safety in software project management?
  3. What are the different factors that cause changes in software? How do change control works?
  4. --- Content provided by‍ FirstRanker.com ---

  5. How Risk Management is important in software project management? Explain its nature and types.
  6. What are the various processes involved in Software Project Management?

SECTION-C

  1. Compare CMMI and ISO models for software quality in detail. How do they help to control the quality of the software?
  2. Describe various organizational and management issues for a software product.
  3. --- Content provided by​ FirstRanker.com ---

    1. Explain Project closing process.
    2. What are the various methods of Requirement Identification and collection?

NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.


--- Content provided by‌ FirstRanker.com ---


This download link is referred from the post: PTU B.Tech Question Papers 2020 March (All Branches)