Roll No. [T T TTT T[] [ ] Total No. of Pages : 02
Total No. of Questions : 09
--- Content provided by FirstRanker.com ---
B.Tech.(Electrical & Electronics Engg.) (2013 & Onwards E-Il)
(Sem.=7)
GENERATION AND CONTROL OF POWER
Subject Code : BTEEE-804A
M.Code : 71963
--- Content provided by FirstRanker.com ---
Time : 3 Hrs. Max. Marks : 60INSTRUCTION TO CANDIDATES :
- SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
- SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
- SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
--- Content provided by FirstRanker.com ---
SECTION-A
- Answer the following in short :
- What is the objective of power system control?
- What are the problems associated with the interconnected power system?
- Write the tie line power deviation equation in terms of frequency.
- What is the purpose of primary ALFC?
- Define spinning reserve.
- Compare unit commitment and economic dispatch.
- What are the major functions that are carried out in an operations control center?
- What is security monitoring and control?
- What do you mean by fixed head and variable head?
- Why the maximum and minimum power generation limits are required?
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
SECTION-B
- Describe contingency analysis.
- Describe the excitation systems.
- What are the components of speed governor system of an alternator? Derive a transfer function and sketch a block diagram.
- Explain briefly the constraints on unit commitment problem.
- Describe the block diagram of P-V controller.
--- Content provided by FirstRanker.com ---
SECTION-C
--- Content provided by FirstRanker.com ---
- Explain how voltage control can be effected by injection of Reactive Power.
- Discuss a solution technique of AC-DC power flow equations.
- Derive coordination equation for economic dispatch including losses, in the power system. Give steps for economic dispatch calculation. Neglecting losses.
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B.Tech Question Papers 2020 March (All Branches)
--- Content provided by FirstRanker.com ---