FirstRanker.com
Firstranker's choice
Roll No. [ ] Total No. of Pages : 02
--- Content provided by FirstRanker.com ---
Total No. of Questions : 09B.Tech.(EE) PT (Sem.-4)
POWER PLANT ENGINEERING
Subject Code : BTEE-406
M.Code : 72449
--- Content provided by FirstRanker.com ---
Time : 3 Hrs. Max. Marks : 60INSTRUCTION TO CANDIDATES :
- SECTION-A is COMPULSORY consisting of TEN questions carrying TWO marks each.
- SECTION-B contains FIVE questions carrying FIVE marks each and students have to attempt any FOUR questions.
- SECTION-C contains THREE questions carrying TEN marks each and students have to attempt any TWO questions.
--- Content provided by FirstRanker.com ---
SECTION-A
- Write briefly :
- Define Dalton’s law of partial pressure.
- How steam generators are being classified?
- Discuss the role of a feed water heater in a steam power plant.
- What is “specific speed’ of a turbine?
- Define Nuclear Fission.
- What do you mean by binding energy?
- Write a short note on “gas turbine fuels”.
- What are the essential components of a diesel power plant?
- Discuss the benefits of combined operation of various power plants.
- Discuss the types of pollution caused by nuclear power plants.
--- Content provided by FirstRanker.com ---
--- Content provided by FirstRanker.com ---
FirstRanker.com
Firstranker's choice
SECTION-B
--- Content provided by FirstRanker.com ---
- Discuss the problems in ash handling. With the help of a neat sketch describe the working of any one type of ash handling system.
- Name the different type of hydro-turbines. Explain any two of them in detail.
- Find the power produced by fissioning 5 grams of U per day.
- Draw the layout of a diesel power plant and explain it in detail.
- Discuss the advantages of interconnections of various power plants.
--- Content provided by FirstRanker.com ---
SECTION-C
- Explain briefly :
- Open and closed cycles for gas turbines
- Electrostatic precipitator
- A proposed hydro-electric station has an available head of 25 m, a catchment area of 5x107 m2, the rainfall for which is 120 cm per annum. If 75% of the total rainfall can be collected, calculate the power that could be generated. Assume overall efficiency as 65%.
- How nuclear reactors are being classified? Explain with the help of suitable diagrams.
--- Content provided by FirstRanker.com ---
NOTE : Disclosure of Identity by writing Mobile No. or Making of passing request on any page of Answer Sheet will lead to UMC against the Student.
--- Content provided by FirstRanker.com ---
This download link is referred from the post: PTU B.Tech Question Papers 2020 March (All Branches)