FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTU-Hyderabad MBA 1st Sem R17 2018 July 741AG Project Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) 1st Semester (First Semester) R17 2018 July 741AG Project Management Previous Question Paper

This post was last modified on 23 October 2020

This download link is referred from the post: JNTUH MBA 1st Sem Last 10 Year Question Papers (2010-2020) All Regulation-First Semester (JNTU Hyderabad)


Firstranker's choice

FirstRanker.com

R17

--- Content provided by FirstRanker.com ---

Code No: 741AG

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

MBA I Semester Examinations, June/July-2018

PROJECT MANAGEMENT

Time: 3 hours Max. Marks: 75

--- Content provided by FirstRanker.com ---

Note: This question paper contains two parts A and B.

Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART - A 5 × 5 Marks = 25

Answer briefly on:

  1. Systems approach to project management. [5]
  2. --- Content provided by FirstRanker.com ---

  3. Project Planning [5]
  4. Profitability Index [5]
  5. Scrum [5]
  6. Stress Management [5]

PART - B 5 × 10 Marks = 50

--- Content provided by FirstRanker.com ---

  1. What is Project Management? Explain the need and importance of project management in Construction field. [10]
  2. Explain different steps involved in a Project Life Cycle. [10]
  3. Explain about Social cost benefit analysis in Project planning and appraisal. [10]
    OR
  4. Explain about financial, technical, commercial and economic aspects involved in project appraisal. [10]
  5. --- Content provided by FirstRanker.com ---

  6. What is Project Evaluation? Explain the techniques for Project Evaluation? [10]
    OR
  7. From the information given below select any one project for investment according to Net Present Value Method at 10 percent cost of Capital. [10]

    Year Project A (Amount in Rs.) Project B (Amount in Rs.)
    0 15,00,000 32,00,000
    1 5,00,000 10,00,000
    2 8,00,000 10,00,000
    3 9,00,000 9,00,000
    4 10,00,000 9,00,000
    5 6,00,000 8,00,000
  8. --- Content provided by FirstRanker.com ---

  9. a) Explain the steps involved in Project Planning and Control?
    b) Explain the concept of Quality Management with reference to a project. [5+5]
    OR
  10. From the information given in the table draw network diagram, calculate critical path and duration of the project. [10]

    --- Content provided by FirstRanker.com ---

    Activity Predecessor Activity Most Likely
    A - 6
    B A 7
    C A 8
    D B 20
    E B 18
    F C 9
    G E 8
    H D,F 2
    I G,H 7
  11. What is organizational structure? Which organizational structure is suitable for a project and why? [10]
    OR
  12. Explain the need and importance of leadership in successful execution and completion of a project. [10]

-00000-

--- Content provided by FirstRanker.com ---



This download link is referred from the post: JNTUH MBA 1st Sem Last 10 Year Question Papers (2010-2020) All Regulation-First Semester (JNTU Hyderabad)

--- Content provided by FirstRanker.com ---