Download JNTU-Hyderabad MBA 3rd Sem R15 2018 Dec 723AA Production And Operations Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) 3rd Semester (Third Semester) R15 2018 Dec 723AA Production And Operations Management Previous Question Paper


Code No: 723AA
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
MBA III Semester Examinations, December - 2018
PRODUCTION AND OPERATIONS MANAGEMENT
Time: 3 hours Max.Marks:75

Note: This question paper contains two parts A and B.
Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B
consists of 5 Units. Answer any one full question from each unit. Each question carries
10 marks and may have a, b, c as sub questions.

PART - A 5 ? 5 Marks =25

1. Write notes on the following:
a) Job shop production [5]
b) Standardization [5]
c) Group technology lay out [5]
d) Machine scheduling [5]
e) Store Accounting [5]

PART - B 5 ? 10 Marks = 50

2. Explain the nature, scope and importance of Production and Operation
Management. [10]
OR
3. Write on the impact of functional strategies on production system. [10]

4. What is value engineering? What is the step by step approach to value engineering?
[10]
OR
5. Elucidate the steps of Process planning. [10]

6. Discuss the single and multi facility location problems with examples. [10]
OR
7. Describe the Plant lay out design procedure in detail. [10]

8. Explain the concept and importance of scheduling. [10]
OR
9. A company is faced with five tasks which have to be processed through two machines.
Find the idle time by using Johnson?s rule. Also find out the total time span for
completing all the jobs. [10]

Tasks Machine 1 Machine 2
A 4 2
B 3 5
C 5 1
D 7 3
E 8 6

R15

FirstRanker.com - FirstRanker's Choice

Code No: 723AA
JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD
MBA III Semester Examinations, December - 2018
PRODUCTION AND OPERATIONS MANAGEMENT
Time: 3 hours Max.Marks:75

Note: This question paper contains two parts A and B.
Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B
consists of 5 Units. Answer any one full question from each unit. Each question carries
10 marks and may have a, b, c as sub questions.

PART - A 5 ? 5 Marks =25

1. Write notes on the following:
a) Job shop production [5]
b) Standardization [5]
c) Group technology lay out [5]
d) Machine scheduling [5]
e) Store Accounting [5]

PART - B 5 ? 10 Marks = 50

2. Explain the nature, scope and importance of Production and Operation
Management. [10]
OR
3. Write on the impact of functional strategies on production system. [10]

4. What is value engineering? What is the step by step approach to value engineering?
[10]
OR
5. Elucidate the steps of Process planning. [10]

6. Discuss the single and multi facility location problems with examples. [10]
OR
7. Describe the Plant lay out design procedure in detail. [10]

8. Explain the concept and importance of scheduling. [10]
OR
9. A company is faced with five tasks which have to be processed through two machines.
Find the idle time by using Johnson?s rule. Also find out the total time span for
completing all the jobs. [10]

Tasks Machine 1 Machine 2
A 4 2
B 3 5
C 5 1
D 7 3
E 8 6

R15

10. Write short notes on
a) Purchase Management
b) Stores Management
c) Inventory control. [3+3+4]
OR
11. Explain the ABC analysis in detail with example. [10]



--ooOoo--







FirstRanker.com - FirstRanker's Choice

This post was last modified on 23 October 2020