Download JNTU-Hyderabad MBA 3rd Sem R15 2018 Dec 723AA Production And Operations Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) 3rd Semester (Third Semester) R15 2018 Dec 723AA Production And Operations Management Previous Question Paper

This post was last modified on 23 October 2020

This download link is referred from the post: JNTUH MBA 3rd Sem Last 10 Year Question Papers (2010-2020) All Regulation - (JNTU Hyderabad)


Firstranker's choice

FirstRanker.com

R15

--- Content provided by FirstRanker.com ---

Code No: 723AA

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

MBA III Semester Examinations, December - 2018

PRODUCTION AND OPERATIONS MANAGEMENT

Time: 3 hours

--- Content provided by FirstRanker.com ---

Max.Marks:75

Note: This question paper contains two parts A and B.

Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART - A

  1. Write notes on the following:
    • a) Job shop production [5]
    • --- Content provided by FirstRanker.com ---

    • b) Standardization [5]
    • c) Group technology lay out [5]
    • d) Machine scheduling [5]
    • e) Store Accounting [5]
  2. --- Content provided by FirstRanker.com ---

PART - B 5 × 10 Marks = 50

  1. Explain the nature, scope and importance of Production and Operation Management. [10]
    OR
  2. Write on the impact of functional strategies on production system. [10]
  3. What is value engineering? What is the step by step approach to value engineering? [10]
  4. --- Content provided by FirstRanker.com ---

  5. Elucidate the steps of Process planning. [10]
  6. Discuss the single and multi facility location problems with examples. [10]
    OR
  7. Describe the Plant lay out design procedure in detail. [10]
  8. Explain the concept and importance of scheduling. [10]

    --- Content provided by FirstRanker.com ---

    OR
  9. A company is faced with five tasks which have to be processed through two machines. Find the idle time by using Johnson's rule. Also find out the total time span for completing all the jobs. [10]
    Tasks Machine 1 Machine 2
    A 4 2
    B 3 5
    C 5 1
    D 7 3
    E 8 6
  10. Write short notes on
    • a) Purchase Management [3]
    • b) Stores Management [3]
    • --- Content provided by FirstRanker.com ---

    • c) Inventory control. [4]
    OR
  11. Explain the ABC analysis in detail with example. [10]

--00000--


--- Content provided by FirstRanker.com ---


This download link is referred from the post: JNTUH MBA 3rd Sem Last 10 Year Question Papers (2010-2020) All Regulation - (JNTU Hyderabad)