FirstRanker Logo

FirstRanker.com - FirstRanker's Choice is a hub of Question Papers & Study Materials for B-Tech, B.E, M-Tech, MCA, M.Sc, MBBS, BDS, MBA, B.Sc, Degree, B.Sc Nursing, B-Pharmacy, D-Pharmacy, MD, Medical, Dental, Engineering students. All services of FirstRanker.com are FREE

📱

Get the MBBS Question Bank Android App

Access previous years' papers, solved question papers, notes, and more on the go!

Install From Play Store

Download JNTU-Hyderabad MBA 3rd Sem R15 2019 May 723AA Production And Operations Management Question Paper

Download JNTUH (Jawaharlal Nehru Technological University Hyderabad) MBA (Master of Business Administration) 3rd Semester (Third Semester) R15 2019 May 723AA Production And Operations Management Previous Question Paper

This post was last modified on 23 October 2020

This download link is referred from the post: JNTUH MBA 3rd Sem Last 10 Year Question Papers (2010-2020) All Regulation - (JNTU Hyderabad)


FirstRanker's choice

FirstRanker.com


R15

--- Content provided by FirstRanker.com ---

Code No: 723AA

JAWAHARLAL NEHRU TECHNOLOGICAL UNIVERSITY HYDERABAD

MBA III Semester Examinations, April/May-2019

PRODUCTION AND OPERATIONS MANAGEMENT

Time: 3hours

--- Content provided by FirstRanker.com ---

Max.Marks:75

Note: This question paper contains two parts A and B.

Part A is compulsory which carries 25 marks. Answer all questions in Part A. Part B consists of 5 Units. Answer any one full question from each unit. Each question carries 10 marks and may have a, b, c as sub questions.

PART - A 5×5 marks = 25

  1. a) Define the concepts ‘production' and ‘operations' management and its relationship with materials department. [5]
  2. --- Content provided by FirstRanker.com ---

  3. b) Why is capacity planning strategically important? Describe different strategies for expanding capacity. [5]
  4. c) What is the relationship between the volume, variety and flow characteristics of an operating firm and its layout? [5]
  5. d) Briefly discuss Priority Dispatching Rules followed in scheduling process. [5]
  6. e) What is integrated materials management? [5]

PART - B 5 × 10 marks = 50

--- Content provided by FirstRanker.com ---

  1. a) What is a transformation process? Explain the transformation process in a commercial bank. [5+5]
    b) How is job production different from batch production process?
    OR
  2. a) Explain about World Class Manufacturing and its characteristics. [5+5]
    b) Explain generic competitive strategies.
  3. --- Content provided by FirstRanker.com ---

  1. Elaborate different steps involved in product design. Represent the various stages in a block diagram. [10]
    OR
  2. a) What do you understand by ‘value analysis?
    b) What are the different responsibilities of a process planning engineer? Explain with help of a suitable example in any industry of your choice. [5+5]
  1. What are the different types of layouts? How can an organization decide on the type of layout to choose? [10]

    --- Content provided by FirstRanker.com ---

    OR
  2. What is the importance of location decision in operations management? What are the consequences of a bad location selection? [10]
  1. How is scheduling linked to other aspects of production planning? How would you determine the complexity of the scheduling problem? [10]
    OR
  2. A service provider has two stages in service delivery. Initially, the customers arrive at stage 1, get the service and then reach stage 2, where the remaining part of the service is completed. All arriving customers wait at a lounge and are called on some basis into the system once a batch of eight accumulates. All of them go through these two stages, although the time they spend in these two stages may vary depending on their specific requirements. The time spent by a set of eight customers on these two stages are given below.

    --- Content provided by FirstRanker.com ---

    Customer number
    Stage 1 (minutes)
    1 2 3 4 5 6 7 8
    11 10 9 13 12 10 9 11
    Stage 2 (minutes)

    --- Content provided by FirstRanker.com ---

    9 14 10 12 14 14 11 10
    Arrival time (minutes from start of batch) 0 1 3 4 5 7 8 10
    a) Use Johnson's rule to schedule customers in the system
    b) Identify key performance measures for the above situation and compute them for the solution obtained using Johnson's rule.
    c) If you schedule the customers using FCFS what is its impact on the performance criteria? [10]
  3. --- Content provided by FirstRanker.com ---

  1. What are the advantages and disadvantages of managing inventory? How you decide about the EOQ, re-order level, maximum, minimum level of the inventory having following details-
    a) Annual demand - 48000 units
    b) Unit cost - Rs 1.25
    c) Ordering cost - Rs 45
    d) Caring cost - 15% of average inventory

    --- Content provided by FirstRanker.com ---

    e) Working days - 300 days a year
    f) Procurement time - 12 days
    g) Safety stock - 500 units [10]
    OR
  2. a) How ABC analysis and VED analysis are different form each other?

    --- Content provided by FirstRanker.com ---

    b) Write short note on purchase management. [5+5]