MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
FirstRanker.com - FirstRanker's Choice
MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
b. continuous
c. optimal
d. economic
10. In the linear programming formulation of the shortest route problem, there is one
constraint for each node indicating
a. capacity on each path
b. whatever comes into a node must also go out
c. capacity on each arc
d. a maximum capacity.on a path
I l. The minimal spanning tree problem determines the
connecting all nodes in the network
total branch lengths
a. selected
b. maximum
c. minimum
d. divided
12. The objective of the maximal flow solution approach is to
amount of flow from an origin to a destination
a. mrnrmrze
b. maximize
c. discriminate
d. divide
13. lf an activity cannot be delayed without affecting the entire project, it is a
activity
a. completed
b.
qitical
c. conjugated
"
d. none ofthe above
14. A represents the beginning and end ofactivities, referred to as events.
a. path
b. arc
c. branch
d. node
15. When an activity is completed at a node, it has been
a. finished
b. ended
c. realized
d. completed
16. Project management differs from management for more traditional activities mainly
because of
a. its limited time frame
b. its unique set of activities
c.aandb
d. none ofthe above
17. The critical path is the time the network can be completed.
a. maximum
b. minimum
c. longest
d. shortest
18. Attributes of decision-making techniques include all of the following except:
a. payoffs
the total
FirstRanker.com - FirstRanker's Choice
MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
b. continuous
c. optimal
d. economic
10. In the linear programming formulation of the shortest route problem, there is one
constraint for each node indicating
a. capacity on each path
b. whatever comes into a node must also go out
c. capacity on each arc
d. a maximum capacity.on a path
I l. The minimal spanning tree problem determines the
connecting all nodes in the network
total branch lengths
a. selected
b. maximum
c. minimum
d. divided
12. The objective of the maximal flow solution approach is to
amount of flow from an origin to a destination
a. mrnrmrze
b. maximize
c. discriminate
d. divide
13. lf an activity cannot be delayed without affecting the entire project, it is a
activity
a. completed
b.
qitical
c. conjugated
"
d. none ofthe above
14. A represents the beginning and end ofactivities, referred to as events.
a. path
b. arc
c. branch
d. node
15. When an activity is completed at a node, it has been
a. finished
b. ended
c. realized
d. completed
16. Project management differs from management for more traditional activities mainly
because of
a. its limited time frame
b. its unique set of activities
c.aandb
d. none ofthe above
17. The critical path is the time the network can be completed.
a. maximum
b. minimum
c. longest
d. shortest
18. Attributes of decision-making techniques include all of the following except:
a. payoffs
the total
b. constraints
c. alternatives
d. states ofnature
19. with the criterion
,
the decision maker attempts to avoid regret.
a. minimax regret
b. equal likelihood
c. Hurwicz
d. maximin
20. To lose the opportunity to make a defined profit by making the best decision is
referred to as:
a. equal likelihood criteiion
b. state
c. payoff
d. regret
21. The length of a queue
a. could be finite
b. could be infinite
c. can constantly change
d. all ofthe above
22. Items rnay be taken from a queue
a. on a first-come-first-serve
basis
b. on a last-come-first-serve
basis
c. according to the due date of the item
d. all ofthe above
23. which of the following items is not a part of the queuing system?
a. arrival rate
b. service facility
c. waiting line
d. activity flow
24.ln a single-server queuing
model, the average number customers in the queuing
system is calculated by dividing the anival rate by:
a. service rate
b. service time
c. service rate minus anival rate
d. service rate plus arrival rate
25. The most important factors to consider in analyzing a queuing
system are
a. the service and arrival rate
b. the nature of the calling population
c. the queue
discipline
d. all ofthe above
26.
Queuing
analysis is a deterministic technique.
a. True
b. False
27.The operating characteiistics
of a queuing
system provide information rather than an
optimization of a queuing system.
a. True
b. False
28. The applicability of forecasting methods depends on
a. the time frame of the forecast
b. the existence of patterns
in the forecast
FirstRanker.com - FirstRanker's Choice
MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
b. continuous
c. optimal
d. economic
10. In the linear programming formulation of the shortest route problem, there is one
constraint for each node indicating
a. capacity on each path
b. whatever comes into a node must also go out
c. capacity on each arc
d. a maximum capacity.on a path
I l. The minimal spanning tree problem determines the
connecting all nodes in the network
total branch lengths
a. selected
b. maximum
c. minimum
d. divided
12. The objective of the maximal flow solution approach is to
amount of flow from an origin to a destination
a. mrnrmrze
b. maximize
c. discriminate
d. divide
13. lf an activity cannot be delayed without affecting the entire project, it is a
activity
a. completed
b.
qitical
c. conjugated
"
d. none ofthe above
14. A represents the beginning and end ofactivities, referred to as events.
a. path
b. arc
c. branch
d. node
15. When an activity is completed at a node, it has been
a. finished
b. ended
c. realized
d. completed
16. Project management differs from management for more traditional activities mainly
because of
a. its limited time frame
b. its unique set of activities
c.aandb
d. none ofthe above
17. The critical path is the time the network can be completed.
a. maximum
b. minimum
c. longest
d. shortest
18. Attributes of decision-making techniques include all of the following except:
a. payoffs
the total
b. constraints
c. alternatives
d. states ofnature
19. with the criterion
,
the decision maker attempts to avoid regret.
a. minimax regret
b. equal likelihood
c. Hurwicz
d. maximin
20. To lose the opportunity to make a defined profit by making the best decision is
referred to as:
a. equal likelihood criteiion
b. state
c. payoff
d. regret
21. The length of a queue
a. could be finite
b. could be infinite
c. can constantly change
d. all ofthe above
22. Items rnay be taken from a queue
a. on a first-come-first-serve
basis
b. on a last-come-first-serve
basis
c. according to the due date of the item
d. all ofthe above
23. which of the following items is not a part of the queuing system?
a. arrival rate
b. service facility
c. waiting line
d. activity flow
24.ln a single-server queuing
model, the average number customers in the queuing
system is calculated by dividing the anival rate by:
a. service rate
b. service time
c. service rate minus anival rate
d. service rate plus arrival rate
25. The most important factors to consider in analyzing a queuing
system are
a. the service and arrival rate
b. the nature of the calling population
c. the queue
discipline
d. all ofthe above
26.
Queuing
analysis is a deterministic technique.
a. True
b. False
27.The operating characteiistics
of a queuing
system provide information rather than an
optimization of a queuing system.
a. True
b. False
28. The applicability of forecasting methods depends on
a. the time frame of the forecast
b. the existence of patterns
in the forecast
c. the number ofvariables to which the forecast is related
d. all ofthe above
29. Management Science process includes
a. defining problem
b. developing model c. both a and b d. a only
30. .... ... . . is an idealised representation of real life
a. model b. module c. analogue d. iconic model
31. Ifthe value ofthe game is zero it is called
a. zero sum game b. two person zero game c. fair game d. none
32. Principles of modelling ?
a. simplicity b. validity c. clarity d. all the above
33. The outcome ofa game in the form ofgain or losses is called.......
a. pay off b. saddle point c. pay offmatrix d. none
34. The loss incuned because of failure to take the best possible decision
a. opportunity loss b. contemporary loss c. opportunity cost d. expected loss
35. For a linear programming
equations, convex set ofequations is included in region of
a. feasible solutions b. ilisposed solutions c. profit solutions d.loss solutions
36. ln graphical solutions of linear inequalities, solution can be divided into
a. one subset b. two subsets c. three subsets d. four subsets
37. Linear programming
used to optimize mathematical procedure and is
a. subset of mathematical programming
b. dimension of mathematical programming
c. linear mathematical programming
d. all of above
38. In linear programming,
objective function and objective constraints are
a. solved b. linear c. quadratic
d. adjacent
39. Whatrefers
toLinearProgrammingthatincludesanevaluationofrelativerisksanduncertaintiesinvariou
salternativesofchoiceformanagementdecisions?
a) Probabilistic Programming b) Stochastic Programming c) Both A and B
d) Linear Programming
FirstRanker.com - FirstRanker's Choice
MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
b. continuous
c. optimal
d. economic
10. In the linear programming formulation of the shortest route problem, there is one
constraint for each node indicating
a. capacity on each path
b. whatever comes into a node must also go out
c. capacity on each arc
d. a maximum capacity.on a path
I l. The minimal spanning tree problem determines the
connecting all nodes in the network
total branch lengths
a. selected
b. maximum
c. minimum
d. divided
12. The objective of the maximal flow solution approach is to
amount of flow from an origin to a destination
a. mrnrmrze
b. maximize
c. discriminate
d. divide
13. lf an activity cannot be delayed without affecting the entire project, it is a
activity
a. completed
b.
qitical
c. conjugated
"
d. none ofthe above
14. A represents the beginning and end ofactivities, referred to as events.
a. path
b. arc
c. branch
d. node
15. When an activity is completed at a node, it has been
a. finished
b. ended
c. realized
d. completed
16. Project management differs from management for more traditional activities mainly
because of
a. its limited time frame
b. its unique set of activities
c.aandb
d. none ofthe above
17. The critical path is the time the network can be completed.
a. maximum
b. minimum
c. longest
d. shortest
18. Attributes of decision-making techniques include all of the following except:
a. payoffs
the total
b. constraints
c. alternatives
d. states ofnature
19. with the criterion
,
the decision maker attempts to avoid regret.
a. minimax regret
b. equal likelihood
c. Hurwicz
d. maximin
20. To lose the opportunity to make a defined profit by making the best decision is
referred to as:
a. equal likelihood criteiion
b. state
c. payoff
d. regret
21. The length of a queue
a. could be finite
b. could be infinite
c. can constantly change
d. all ofthe above
22. Items rnay be taken from a queue
a. on a first-come-first-serve
basis
b. on a last-come-first-serve
basis
c. according to the due date of the item
d. all ofthe above
23. which of the following items is not a part of the queuing system?
a. arrival rate
b. service facility
c. waiting line
d. activity flow
24.ln a single-server queuing
model, the average number customers in the queuing
system is calculated by dividing the anival rate by:
a. service rate
b. service time
c. service rate minus anival rate
d. service rate plus arrival rate
25. The most important factors to consider in analyzing a queuing
system are
a. the service and arrival rate
b. the nature of the calling population
c. the queue
discipline
d. all ofthe above
26.
Queuing
analysis is a deterministic technique.
a. True
b. False
27.The operating characteiistics
of a queuing
system provide information rather than an
optimization of a queuing system.
a. True
b. False
28. The applicability of forecasting methods depends on
a. the time frame of the forecast
b. the existence of patterns
in the forecast
c. the number ofvariables to which the forecast is related
d. all ofthe above
29. Management Science process includes
a. defining problem
b. developing model c. both a and b d. a only
30. .... ... . . is an idealised representation of real life
a. model b. module c. analogue d. iconic model
31. Ifthe value ofthe game is zero it is called
a. zero sum game b. two person zero game c. fair game d. none
32. Principles of modelling ?
a. simplicity b. validity c. clarity d. all the above
33. The outcome ofa game in the form ofgain or losses is called.......
a. pay off b. saddle point c. pay offmatrix d. none
34. The loss incuned because of failure to take the best possible decision
a. opportunity loss b. contemporary loss c. opportunity cost d. expected loss
35. For a linear programming
equations, convex set ofequations is included in region of
a. feasible solutions b. ilisposed solutions c. profit solutions d.loss solutions
36. ln graphical solutions of linear inequalities, solution can be divided into
a. one subset b. two subsets c. three subsets d. four subsets
37. Linear programming
used to optimize mathematical procedure and is
a. subset of mathematical programming
b. dimension of mathematical programming
c. linear mathematical programming
d. all of above
38. In linear programming,
objective function and objective constraints are
a. solved b. linear c. quadratic
d. adjacent
39. Whatrefers
toLinearProgrammingthatincludesanevaluationofrelativerisksanduncertaintiesinvariou
salternativesofchoiceformanagementdecisions?
a) Probabilistic Programming b) Stochastic Programming c) Both A and B
d) Linear Programming
40. Whatenablesustodeterminetheearliestandthelatesttimesforeachoftheeventsandactivities
andtherebyhe I psintheidentifi
cationoft hecritical path?
a. Programme Evaluation b. ReviewTechnique(pERT)
c. BothAandB d.
Deployment of resources
4l .
----------------models
involves the allocation of resources to activities in such a manner
that some measure of effectiveness is optimized.
a) Sequencing b) Allocation Models c)
eueuing
Theory d) Decision Theory
42. Allocationproblemscanbesolvedby
a) Linear Programming.Technique b) Non
-
Linear Programming Technique c)Both
A and B d) None ofthe above
43. Allocation Models are ---------
a) Iconic models b) Analogue Models c) Symbolic Models d) None of the above
44. Every LPP is associated with another Lpp is called
a) Primal b) Dual c) Non -
linear programming d) None of the above
45' As for maximization in assignment problem, the objective is to maximize the ----------
a) Profit b) optimization c) cost d) None of the above
46. --------'----
is one of the fundamental combinatoriar optimization problems.
a) Assignment problem
b) Transportation problem c) Optimization
problem
d) None of the above
47. PERT and CPM
a. are most valuable when a small number of activities must be scheduled.
b. have different features and are not appried to the same situation.
c. do not require a chronological relationship among activities.
d. have been combined to develop a procedure that uses the best of each
48. Arcs in a project network indicate
a. completion times. b. precedence relationships. c. activities. d. the critical path.
49. Activities G, P, and R are the immediate predecessors for activity W. If the earliest
finish times for the three are r2, 15. and 10, then the earliest start time for w
FirstRanker.com - FirstRanker's Choice
MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
b. continuous
c. optimal
d. economic
10. In the linear programming formulation of the shortest route problem, there is one
constraint for each node indicating
a. capacity on each path
b. whatever comes into a node must also go out
c. capacity on each arc
d. a maximum capacity.on a path
I l. The minimal spanning tree problem determines the
connecting all nodes in the network
total branch lengths
a. selected
b. maximum
c. minimum
d. divided
12. The objective of the maximal flow solution approach is to
amount of flow from an origin to a destination
a. mrnrmrze
b. maximize
c. discriminate
d. divide
13. lf an activity cannot be delayed without affecting the entire project, it is a
activity
a. completed
b.
qitical
c. conjugated
"
d. none ofthe above
14. A represents the beginning and end ofactivities, referred to as events.
a. path
b. arc
c. branch
d. node
15. When an activity is completed at a node, it has been
a. finished
b. ended
c. realized
d. completed
16. Project management differs from management for more traditional activities mainly
because of
a. its limited time frame
b. its unique set of activities
c.aandb
d. none ofthe above
17. The critical path is the time the network can be completed.
a. maximum
b. minimum
c. longest
d. shortest
18. Attributes of decision-making techniques include all of the following except:
a. payoffs
the total
b. constraints
c. alternatives
d. states ofnature
19. with the criterion
,
the decision maker attempts to avoid regret.
a. minimax regret
b. equal likelihood
c. Hurwicz
d. maximin
20. To lose the opportunity to make a defined profit by making the best decision is
referred to as:
a. equal likelihood criteiion
b. state
c. payoff
d. regret
21. The length of a queue
a. could be finite
b. could be infinite
c. can constantly change
d. all ofthe above
22. Items rnay be taken from a queue
a. on a first-come-first-serve
basis
b. on a last-come-first-serve
basis
c. according to the due date of the item
d. all ofthe above
23. which of the following items is not a part of the queuing system?
a. arrival rate
b. service facility
c. waiting line
d. activity flow
24.ln a single-server queuing
model, the average number customers in the queuing
system is calculated by dividing the anival rate by:
a. service rate
b. service time
c. service rate minus anival rate
d. service rate plus arrival rate
25. The most important factors to consider in analyzing a queuing
system are
a. the service and arrival rate
b. the nature of the calling population
c. the queue
discipline
d. all ofthe above
26.
Queuing
analysis is a deterministic technique.
a. True
b. False
27.The operating characteiistics
of a queuing
system provide information rather than an
optimization of a queuing system.
a. True
b. False
28. The applicability of forecasting methods depends on
a. the time frame of the forecast
b. the existence of patterns
in the forecast
c. the number ofvariables to which the forecast is related
d. all ofthe above
29. Management Science process includes
a. defining problem
b. developing model c. both a and b d. a only
30. .... ... . . is an idealised representation of real life
a. model b. module c. analogue d. iconic model
31. Ifthe value ofthe game is zero it is called
a. zero sum game b. two person zero game c. fair game d. none
32. Principles of modelling ?
a. simplicity b. validity c. clarity d. all the above
33. The outcome ofa game in the form ofgain or losses is called.......
a. pay off b. saddle point c. pay offmatrix d. none
34. The loss incuned because of failure to take the best possible decision
a. opportunity loss b. contemporary loss c. opportunity cost d. expected loss
35. For a linear programming
equations, convex set ofequations is included in region of
a. feasible solutions b. ilisposed solutions c. profit solutions d.loss solutions
36. ln graphical solutions of linear inequalities, solution can be divided into
a. one subset b. two subsets c. three subsets d. four subsets
37. Linear programming
used to optimize mathematical procedure and is
a. subset of mathematical programming
b. dimension of mathematical programming
c. linear mathematical programming
d. all of above
38. In linear programming,
objective function and objective constraints are
a. solved b. linear c. quadratic
d. adjacent
39. Whatrefers
toLinearProgrammingthatincludesanevaluationofrelativerisksanduncertaintiesinvariou
salternativesofchoiceformanagementdecisions?
a) Probabilistic Programming b) Stochastic Programming c) Both A and B
d) Linear Programming
40. Whatenablesustodeterminetheearliestandthelatesttimesforeachoftheeventsandactivities
andtherebyhe I psintheidentifi
cationoft hecritical path?
a. Programme Evaluation b. ReviewTechnique(pERT)
c. BothAandB d.
Deployment of resources
4l .
----------------models
involves the allocation of resources to activities in such a manner
that some measure of effectiveness is optimized.
a) Sequencing b) Allocation Models c)
eueuing
Theory d) Decision Theory
42. Allocationproblemscanbesolvedby
a) Linear Programming.Technique b) Non
-
Linear Programming Technique c)Both
A and B d) None ofthe above
43. Allocation Models are ---------
a) Iconic models b) Analogue Models c) Symbolic Models d) None of the above
44. Every LPP is associated with another Lpp is called
a) Primal b) Dual c) Non -
linear programming d) None of the above
45' As for maximization in assignment problem, the objective is to maximize the ----------
a) Profit b) optimization c) cost d) None of the above
46. --------'----
is one of the fundamental combinatoriar optimization problems.
a) Assignment problem
b) Transportation problem c) Optimization
problem
d) None of the above
47. PERT and CPM
a. are most valuable when a small number of activities must be scheduled.
b. have different features and are not appried to the same situation.
c. do not require a chronological relationship among activities.
d. have been combined to develop a procedure that uses the best of each
48. Arcs in a project network indicate
a. completion times. b. precedence relationships. c. activities. d. the critical path.
49. Activities G, P, and R are the immediate predecessors for activity W. If the earliest
finish times for the three are r2, 15. and 10, then the earliest start time for w
a. is 10. b. is 12. c. is 15. d. cannot be determined.
50. The critical path
a. is any path that goes from the starting node to the completion node.
b. is a combination of all paths.
c. is the shortest path. d. is the longest path
51. Times between two successive requests aniving, called the
a. Interarrival time b. Arrival time c. Poisson distribution d. Average residual
service time
52. With the transportationtechnique,
the initial solution can be generated in any fashion
one chooses. The only restriction is that
a. the solution must be optimal.b. the solution is not degenerate. c. one must use the
northwest-corner method. d. the edge constraints for supply and demand are
satisfied.
53. Transportation models can be used for which of the following decisions?
a) facility location b) production mix c) media selection d) ponfolio selection
e) employee shift scheduling
54' The two most common objectives for the assignment problem
are the minimization of
a) uncertainty or inexperience b) total costs or inexperience c) total costs or total
time d) total time or inexperience e) total costs or uncertainty
55. In an assignment problem
a) the number of rows and columns must be equal. b) the number of rows must
exceed the number of columns. c) the number of rows must equal or exceed the
number of columns d) the number of columns must equal or exceed the number of
rows. e) none ofthe above
56. The decisions which are affect the business in the short run ?
a. tactical solutions b. strategic decisions c. management decisions d. none
57. which of the following methods is used only with the assignment problem?
a) the Hungarian method b) stepping-stone method c) MODI method d) vogel,s
approximation method
-
e) the simplex method
58. Monte carlo simulation gets its name from which of the following?
FirstRanker.com - FirstRanker's Choice
MANGEMENT SCIENCE
l. In a balanced transportation model where supply equals demand,
a. all constraints are eqgalities
b. none of the constraints are equalities
c. all constraints are inequalities
d. none of the constraints are inequalities
Z. In a transportation
problem, items are allocated from sources to destinations
a. ata maximum cost
b. at a minimum cost
c. at a minimum profit
d. at a minimum revenue
3. The assignment model is a special case of the model'
a. maximum-flow
b. transportation
c. shortest-route
d. none ofthe above
4. The linear programming model for a transportation
problem has constraints for supply
at each and at each destination'
a. destination / source
b. source / destination
"
c. demand / source
d. source / demand
5. An assignment
probtem is a special form of transportation
problem where all supply
and demand values equal
a.0
b. I
c.2
d.3
6. The transshipment
model is an extension of the transportation
model in which
intermediate transshipment
points are
--
between the sources and destinations'
a. decreased
b. deleted
c. subtracted
d. added
7. Inventory costs include
a. carrying
b. ordering
c. shortage costs
d. all ofthe above
8. In a(an)
inventory system a constant amount is ordered when
inventory cleclines to a predetermined level'
a. optional
b. economic
c. periodic
d. continuous
9. EOQ is a(an)
-_--
inventory sYstem'
a. periodic
b. continuous
c. optimal
d. economic
10. In the linear programming formulation of the shortest route problem, there is one
constraint for each node indicating
a. capacity on each path
b. whatever comes into a node must also go out
c. capacity on each arc
d. a maximum capacity.on a path
I l. The minimal spanning tree problem determines the
connecting all nodes in the network
total branch lengths
a. selected
b. maximum
c. minimum
d. divided
12. The objective of the maximal flow solution approach is to
amount of flow from an origin to a destination
a. mrnrmrze
b. maximize
c. discriminate
d. divide
13. lf an activity cannot be delayed without affecting the entire project, it is a
activity
a. completed
b.
qitical
c. conjugated
"
d. none ofthe above
14. A represents the beginning and end ofactivities, referred to as events.
a. path
b. arc
c. branch
d. node
15. When an activity is completed at a node, it has been
a. finished
b. ended
c. realized
d. completed
16. Project management differs from management for more traditional activities mainly
because of
a. its limited time frame
b. its unique set of activities
c.aandb
d. none ofthe above
17. The critical path is the time the network can be completed.
a. maximum
b. minimum
c. longest
d. shortest
18. Attributes of decision-making techniques include all of the following except:
a. payoffs
the total
b. constraints
c. alternatives
d. states ofnature
19. with the criterion
,
the decision maker attempts to avoid regret.
a. minimax regret
b. equal likelihood
c. Hurwicz
d. maximin
20. To lose the opportunity to make a defined profit by making the best decision is
referred to as:
a. equal likelihood criteiion
b. state
c. payoff
d. regret
21. The length of a queue
a. could be finite
b. could be infinite
c. can constantly change
d. all ofthe above
22. Items rnay be taken from a queue
a. on a first-come-first-serve
basis
b. on a last-come-first-serve
basis
c. according to the due date of the item
d. all ofthe above
23. which of the following items is not a part of the queuing system?
a. arrival rate
b. service facility
c. waiting line
d. activity flow
24.ln a single-server queuing
model, the average number customers in the queuing
system is calculated by dividing the anival rate by:
a. service rate
b. service time
c. service rate minus anival rate
d. service rate plus arrival rate
25. The most important factors to consider in analyzing a queuing
system are
a. the service and arrival rate
b. the nature of the calling population
c. the queue
discipline
d. all ofthe above
26.
Queuing
analysis is a deterministic technique.
a. True
b. False
27.The operating characteiistics
of a queuing
system provide information rather than an
optimization of a queuing system.
a. True
b. False
28. The applicability of forecasting methods depends on
a. the time frame of the forecast
b. the existence of patterns
in the forecast
c. the number ofvariables to which the forecast is related
d. all ofthe above
29. Management Science process includes
a. defining problem
b. developing model c. both a and b d. a only
30. .... ... . . is an idealised representation of real life
a. model b. module c. analogue d. iconic model
31. Ifthe value ofthe game is zero it is called
a. zero sum game b. two person zero game c. fair game d. none
32. Principles of modelling ?
a. simplicity b. validity c. clarity d. all the above
33. The outcome ofa game in the form ofgain or losses is called.......
a. pay off b. saddle point c. pay offmatrix d. none
34. The loss incuned because of failure to take the best possible decision
a. opportunity loss b. contemporary loss c. opportunity cost d. expected loss
35. For a linear programming
equations, convex set ofequations is included in region of
a. feasible solutions b. ilisposed solutions c. profit solutions d.loss solutions
36. ln graphical solutions of linear inequalities, solution can be divided into
a. one subset b. two subsets c. three subsets d. four subsets
37. Linear programming
used to optimize mathematical procedure and is
a. subset of mathematical programming
b. dimension of mathematical programming
c. linear mathematical programming
d. all of above
38. In linear programming,
objective function and objective constraints are
a. solved b. linear c. quadratic
d. adjacent
39. Whatrefers
toLinearProgrammingthatincludesanevaluationofrelativerisksanduncertaintiesinvariou
salternativesofchoiceformanagementdecisions?
a) Probabilistic Programming b) Stochastic Programming c) Both A and B
d) Linear Programming
40. Whatenablesustodeterminetheearliestandthelatesttimesforeachoftheeventsandactivities
andtherebyhe I psintheidentifi
cationoft hecritical path?
a. Programme Evaluation b. ReviewTechnique(pERT)
c. BothAandB d.
Deployment of resources
4l .
----------------models
involves the allocation of resources to activities in such a manner
that some measure of effectiveness is optimized.
a) Sequencing b) Allocation Models c)
eueuing
Theory d) Decision Theory
42. Allocationproblemscanbesolvedby
a) Linear Programming.Technique b) Non
-
Linear Programming Technique c)Both
A and B d) None ofthe above
43. Allocation Models are ---------
a) Iconic models b) Analogue Models c) Symbolic Models d) None of the above
44. Every LPP is associated with another Lpp is called
a) Primal b) Dual c) Non -
linear programming d) None of the above
45' As for maximization in assignment problem, the objective is to maximize the ----------
a) Profit b) optimization c) cost d) None of the above
46. --------'----
is one of the fundamental combinatoriar optimization problems.
a) Assignment problem
b) Transportation problem c) Optimization
problem
d) None of the above
47. PERT and CPM
a. are most valuable when a small number of activities must be scheduled.
b. have different features and are not appried to the same situation.
c. do not require a chronological relationship among activities.
d. have been combined to develop a procedure that uses the best of each
48. Arcs in a project network indicate
a. completion times. b. precedence relationships. c. activities. d. the critical path.
49. Activities G, P, and R are the immediate predecessors for activity W. If the earliest
finish times for the three are r2, 15. and 10, then the earliest start time for w
a. is 10. b. is 12. c. is 15. d. cannot be determined.
50. The critical path
a. is any path that goes from the starting node to the completion node.
b. is a combination of all paths.
c. is the shortest path. d. is the longest path
51. Times between two successive requests aniving, called the
a. Interarrival time b. Arrival time c. Poisson distribution d. Average residual
service time
52. With the transportationtechnique,
the initial solution can be generated in any fashion
one chooses. The only restriction is that
a. the solution must be optimal.b. the solution is not degenerate. c. one must use the
northwest-corner method. d. the edge constraints for supply and demand are
satisfied.
53. Transportation models can be used for which of the following decisions?
a) facility location b) production mix c) media selection d) ponfolio selection
e) employee shift scheduling
54' The two most common objectives for the assignment problem
are the minimization of
a) uncertainty or inexperience b) total costs or inexperience c) total costs or total
time d) total time or inexperience e) total costs or uncertainty
55. In an assignment problem
a) the number of rows and columns must be equal. b) the number of rows must
exceed the number of columns. c) the number of rows must equal or exceed the
number of columns d) the number of columns must equal or exceed the number of
rows. e) none ofthe above
56. The decisions which are affect the business in the short run ?
a. tactical solutions b. strategic decisions c. management decisions d. none
57. which of the following methods is used only with the assignment problem?
a) the Hungarian method b) stepping-stone method c) MODI method d) vogel,s
approximation method
-
e) the simplex method
58. Monte carlo simulation gets its name from which of the following?
a. Model formulation .b.
Analysis c. Data collection d. Random-number
assignment
59. Which of the following statistical methods are commonly used to analyze simulation
results?
a. t-tests b. Regression analysis c. Analysis of variance d. All of the above
60. VAM stands for -----------,,
a) Vogeal's Approximation Method b) vogel's Approximate Method c) Vangel's
Approximation Method d) Vogel's Approximation Method