Printed Pages: 3 614 NCE-302
(Following Paper ID and Roll No. to be ?lled in your
Answer Book)
Roll No.
B. Tech.
(SEM. [1]) THEORY EXAMINATION, 2015-16
BUILDING MATERIALS & CONSTRUCTION
[Time:3 hours] [Total Marks: 100]
Note: Attempt all 3 sections.
Section - A
l. Attempt all parts. All parts carry equal marks. Write
answer of each part in short : (2x10=20)
(a) Explain the term L ime bursting.
(b) What do you mean by seasoning 0ftimber ??
(0) Explain the term HVAC.
(d) Give the elassi?cation of plastics.
(e) Draw a sketch showing the position of gable and
dormer widow.
(f) Explain the term IOWSIZ.
13000 (1) P.T.O.

Attempt any ?ve questions from this seetion.
2.
13000 (2)
(g) Enlist the importance of Hollow block
construction.
(h) What do you understand by workability 0f
- concrctc?
(i) What do you understand by king closer and queen
closer ?
(i) What do you understand by masonry construction?
Section - B
( 1 0x5= l 0)
Enlist the various types of doors and explain in detail
any four of them.
Explain the three commercial form of iron products.
Explain how post-construction anti termite treatment is
carried out in a bulding. '
Explain the various types of pitched roofs.
Explain the various methods of damp proo?ng.
What is pozzollana ? Explain the various pozzolonic
materials.
Give the classi?cation of building as per NBC with
suitable examples.
NCE?302
9.
Attempt any two questions from this section.
What are varnishes ? Discuss its common constituents.
Section - C
(15x2=30)
10. What is cement ? Explain the various tests needed to be
performed to ensure the suitability of cement.
1 1. Discuss in detail the various principles for planning the
building.
12. Explain in detail with suitable sketches the setting out
work that is needed to be carried out for a building.
_X?
NCE-302
13000 . (3)