Download AKTU B-Tech 6th Sem 2014-2015 Software Project Management Question Paper

Download AKTU (Dr. A.P.J. Abdul Kalam Technical University (AKTU), formerly Uttar Pradesh Technical University (UPTU) B-Tech 6th Semester (Sixth Semester) 2014-2015 Software Project Management Question Paper

Printed Pages : 3
lllllljllllJllllslllll?lllll!l||l!|ll|!|| Emsm
(Following Paper ID and Roll No. to be filled in your Answer Book)
PAPER ID : 113604
Roll No.
B. Tech.
(SEM. VI) THEORY EXAMINATION, 2014-15
SOFTWARE PROJECT MANAGEMENT
Time : 3 Hours] [Total Marks : 100.
Note : Attempt all questions,
1 Attempt any four parts of the following : . 4X5=20
(a) List at least seven deliverables in a s/w project;
(b) Enumerate the authorities of a project manager.
(C) Explain any cost estimation Technique.
(d) List ?ve factors of failing software project.
' (e) Write about so?ware development team activities.
(I) Discuss different challenges and problem faced by
the project manager / Project leader.
113604] 1 [ Contd...

(a)
113604]
Attempt any four parts of the following : 4XS=20
6
Give the overview of the stepwise planning of the V
software project development.
(b) Explain the term project scope with suitable
example.
(c) Explain dimension of project monitoring and
control and presentation. Why presentation is
important for good so?ware?
(d) Explain all type of software review technique.
(c) How to prioritize the monitoring ? Explain.
(1) Explain various problem encountered with s/w
projects.
3 Attempt any two parts of the following : 2><10=20
(a) What do you mean by work breakdown structure
in context to software project and product?
Discuss with example.
(b) What is PERT analysis? Compare and constiuct
(1) Optimistic time estimation.
(1i) Pessimistic time estimation.
(iii) Most likely time estimation.
(c) Explain the terms with relative cases
(i) CPI cost performance index.
(n) BCWS budget cost of work scheduled
(iii) SPI- schedule performance index.
2 [ Contd...
4 Attempt any two parts of the following : 2><10=20
(a) Explain the SE] capability Maturity Model with
its all variants.
(b) Write and explain so?ware quality attributes.
draw Mc-Call quality assurance Model.
(c) De?ne various type of testing strategies with
examples.
5 Attempt any two parts of the following : 2><10=20
(a) Explain So?ware con?guration Management
(b) Explain all types of risk which is occurs during
so?ware development.
(c) Explain various type of so?ware project
management tools.
113604] 3 [4825 1